Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.
Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10
ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.
Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.
Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.
Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.
Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:
Current Operating Areas Where logging or road construction is in progress but not completed, unless agreed otherwise, Purchaser shall, before opera- tions cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Project Site The “Project Site” is the place where the Work is being carried on.