Faceplate Sample Clauses

Faceplate. (a) Possibly molded plastic if less expensive than metal. (b) Use printed stickers vs. silkscreening for logos. This would be advantageous for potential OEM's. (c) Snap on faceplate/bezel. (d) Construct the LED's as a single assembly to snap into the faceplate. (e) Three openings. i. Two hard drive openings into which standard 3.5" hard drives can be inserted onto rails with power/data cable mate. ii. One opening for an internal tape backup - specific tape system needs to be chosen.
AutoNDA by SimpleDocs
Faceplate. Refer to wall plate material and color requirements for toggle switches, as specified in Section 26 27 26, WIRING DEVICES. Consult with Campus Project Manger regarding Campus standards.
Faceplate. Refer to wall plate material and color requirements for toggle switches, as specified in Section 26 27 26, WIRING DEVICES.

Related to Faceplate

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Artwork Licensee must use the Java Logo(s) only in the exact form of approved camera-ready artwork or electronic artwork received from Oracle or Oracle's designee.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Directory To participate in the MnDOT TGB program, a business must be certified at the time of contract execution. Certified Targeted Group Businesses are listed in the Directory of Certified Targeted Group, Economically Disadvantaged and VET Vendors. MnDOT makes no representation as to any TGB’s technical or financial ability to perform the work. Prime contractors are solely responsible for performing due diligence in hiring TGB firms. A TGB’s failure to perform the work will not be considered justification for a compensation increase or time extension.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

Time is Money Join Law Insider Premium to draft better contracts faster.