Facilities To Provide Maximum Contract Demand Sample Clauses

Facilities To Provide Maximum Contract Demand. To provide the Maximum Contract Demand, Company will extend network service in and out of the new 345kV/138kV Glendale South substation via an existing 345kV transmission line (Brown North to Hardin County). Two new 138kV lines will exit the Glendale South Substation and terminate near the Facility at the new 138kV/24.7kV Glendale Industrial Substation. All facilities and equipment behind the Delivery Point, including the power transformers, will be determined by Customer according to its required voltage level of 24.7 kV.
AutoNDA by SimpleDocs
Facilities To Provide Maximum Contract Demand. To provide the Maximum KENTUCKY PUBLIC SERVICE COMMISSION Xxxxx X. Xxxxxxxx Executive Director EFFECTIVE 12/18/2023 PURSUANT TO 807 KAR 5:011 SECTION 9 (1) Contract Demand, Company will extend network service in and out of the new 345kV/138kV Glendale South substation via an existing 345kV transmission line (Brown North to Hardin County). Two new 138kV lines will exit the Glendale South Substation and terminate near the Facility at the new 138kV/24.7kV Glendale Industrial Substation. All facilities and equipment behind the Delivery Point, including the power transformers, will be determined by Customer according to its required voltage level of 24.7 kV.

Related to Facilities To Provide Maximum Contract Demand

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Phase Services 3.1.1 – Basic Construction Services