Transmission Line. The Connecting Transmission Owner will review the drawings, design studies, and calculations pertaining to the Transmission Line. The Connecting Transmission Owner will review drawings related to the Environmental Management and Construction Plan for Developer’s Article VII application at the NYPSC, including detailed plan & profiles of the proposed transmission line along with related notes and construction sequencing information. The Connecting Transmission Owner will review and approve SUF material specifications. Such engineering services may also include additional services the Connecting Transmission Owner believes are necessary in order for it to be designed and constructed in accordance with its standards. For the items listed above, the Connecting Transmission Owner’s engineers will notify Developer of the estimated review turnaround times and the time when Developer must deliver specific materials and drawings.
Transmission Line. (a) Where it is reasonable, practical and economic, the Customer shall construct the Transmission Line. The Customer is encouraged to build to B.C. Hydro standards.
(b) A Customer has two options for operation of the Transmission Line it constructs on its own Right- of-Way for the supply of Electricity:
Transmission Line. Developer is designing and procuring steel turning structures within the existing WD-1 230 kV ROW. The Connecting Transmission Owner will construct the turning structures in the 230kV ROW bringing the 230 kV line to the turning structures feeding the Xxxxxxx Substation. The Developer shall be responsible for designing, procuring, and constructing the steel monopole structures and transmission work required to bring the 230 kV lines from the ROW turning structures into the dead- end structures within the Xxxxxxx Substation. Description Cost Estimate POI Substation Engineering & Design 55,125 POI Substation Construction Management 19,189 Major Substation Equipment 134,505 Construction Contract 350,595 (B) Cost Estimate for CTOAF and SASUF Xxxxxxx Substation CTOAF Estimates SASUF Estimates Description Cost Estimate POI Substation Engineering & Design 496,125 POI Substation Construction Management 172,699 Major Substation Equipment 3,576,795 Construction Contract 3,155,355 The Common SUFs include only the following:
x. Xxxxx (St. Xxxxxxxx/FDR Power Plant)
x. Xxxxxxx Substation
x. Xxxxxx Substation
x. Xxxx Substation
e. Big Hill
f. Plattsburgh Substation • Xxxxxx and Plattsburgh SUFs, Phase II Only
(A) Microwave Communications System Upgrade Facilities
Transmission Line. Developer is designing and procuring steel turning structures within the existing WD-1 230 kV ROW. The Connecting Transmission Owner will construct the turning structures in the 230kV ROW bringing the 230 kV line to the turning structures feeding the Xxxxxxx Substation. The Developer shall be responsible for designing, procuring, and constructing the steel monopole structures and transmission work required to bring the 230 kV lines from the ROW turning structures into the dead-end structures within the Xxxxxxx Substation. Connecting Transmission Owner shall update and install the panel labels, equipment labels, drawings and relay settings, if required (plus any additional work required) at Xxxxxx and Xxxxx associated with segmentation of the WD-1 line and conversion of the line to WPN-1 and PND-1.
Transmission Line. For the new tranches of line created by the sectioning of the Piura Oeste-Pariñas 220 kV Line (L-2248), the protective relays to be implemented in the Xxxxx del Chira 220 kV Substation shall follow the same protective philosophy currently used in Line L-2248, based on the use of the fiber optic cable in Line L-2248 and the branch subject matter of Point 2.
Transmission Line. The GOL represents, warrants and covenants that as of the earlier to occur of the Construction Start Date and the date of Financial Closing: (i) the GOL will, itself or through another GOL Entity, be the sole and exclusive owner of the Transmission Line Area free of any Liens (other than Permitted Liens), (ii) other than the Transmission Line Area, no land or other interests in real property of any type are required under the Laws of Liberia for the design, development, construction, supply, start up, commissioning, testing, financing, implementation, operation or maintenance of the Transmission Line, and (iii) each parcel of land, contemplated in clause (i), as well as the acquisition thereof by or on behalf of the GOL after the date of this Agreement (as the case may be), is or will be (as the case may be), in compliance with all Laws of Liberia, all Environmental Laws and the Standards. On or before the earlier to occur of the Construction Start Date and the date of Financial Closing, the GOL shall deliver to the Company documentation evidencing such ownership.
Transmission Line. Any Beneficial End Use Product that requires to connect to an off-site pipeline or transmission line to the Energy Customer's premises shall comply with and be included within the requirements and liabilities assumed by the Contractor under this Agreement. Any portion of the pipeline or transmission line on public right of way shall be clearly marked according to industry or governmental standards. The depth of the pipeline or transmission line shall comply with local permitting code and/or State law whichever is applicable.
Transmission Line. 4.1 The Developer shall take all necessary steps for the exercise of the Right of Way for the construction of the Transmission Line and shall compensate at its own cost in accordance with the Applicable Laws, damages caused to third parties by the exercise of such Right of Way;
4.2 The Developer shall design and construct the Transmission Line at its own cost in accordance with Applicable Laws, RFP submission and subject to the requirements of the Connection Agreement;
4.3 Upon successful completion and commissioning of the Transmission Line, the Developer shall transfer the ownership of the Transmission Line to the OST, in accordance with the Applicable Laws Connection Agreement;
(a) upon transfer of the ownership of the Transmission Line to OST as per this clause the Facility Boundary Metering Point shall be deemed to be the Grid Connection Metering Point;
(b) OST shall be responsible for the operation and maintenance of the Transmission Line, in accordance with the Applicable Laws and the Connection Agreement.
Transmission Line. A new 345-kV transmission line will be needed to connect the new substation to the existing BPA line. If the substation is located at the BPA right-of-way, this line would be very short. The line would have two circuits, one into the substation and one out of the substation. The construction could be similar to the existing lattice towers, and require a right-of-way of up to 300 feet in width.
Transmission Line. The recitals to this Agreement.