Facility and System Layout Sample Clauses

Facility and System Layout. See Exhibit 2, Attachment A
AutoNDA by SimpleDocs
Facility and System Layout. See Exhibit 2, Attachment A 8. Utility: Central Maine Power
Facility and System Layout. See Exhibit 2, Attachment A 8. Utility: Atlantic City Electric Exhibit 2 Attachment A: Facility and System Layout An Aerial Photograph of the Facility See below Conceptual Drawing of the System See below Delivery Point TBD after contract signature Access Points TBD after contract signature Exhibit 3 Solar Power Purchase Agreement General Terms and Conditions
Facility and System Layout. See Exhibit 2, Attachment A. Seller may, at its sole discretion, modify the System layout and design as Seller deems necessary for purposes of permitting, procurement, construction and project implementation, provided that any modifications which change the Estimated System Energy Production by more than 10 percent shall require prior written approval by Purchaser. To the extent of modifications are made pursuant to this Section, the Parties shall amend this Agreement and Exhibits to reflect the final as-built design within 60 days of the Commercial Operation Date.
Facility and System Layout. See Exhibit 2, Attachment A 9. Utility: Ameren Illinois Company [Commonwealth Edison Company/MidAmerican Energy Company] 10. EPC (engineering, procurement, construction) Services Provider (Tentative): Evergreen Solar Services (ESS), Inc. and/or Clean Energy Design Group (CEDG), Inc. Exhibit 2 Attachment A: Facility and System Layout An Aerial Photograph of the Facility See Below Site Plan of the System See Below Delivery Point See Below Access Points See Below
Facility and System Layout. See Exhibit 2, Attachment A 8. Utility: Exhibit 2 Attachment A: Facility and System Layout An Aerial Photograph of the Facility See below Conceptual Drawing of the System See below Delivery Point [written description of Delivery Point, also indicate below] Access Points [written description of access points needed to install and service System, also indicate below] EXAMPLE
Facility and System Layout. See Exhibit 2, Attachment A 8. Interconnecting Utility (or PJM if direct transmission interconnection): Exhibit 2 Attachment A: Facility and System Layout Conceptual Drawing of the System See below Delivery Point [Project Node, PJM West Hub or APS Zone] Exhibit 3 Solar Power Purchase Agreement General Terms and Conditions August 8, 2013 Solar Energy Finance Association Version 1.0
AutoNDA by SimpleDocs

Related to Facility and System Layout

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • System Access CUSTOMER agrees to provide to PROVIDER, at CUSTOMER’S expense, necessary access to the mainframe computer and related information technology systems (the “System”) on which CUSTOMER data is processed during the times (the “Service Hours”) specified in the PSAs, subject to reasonable downtime for utility outages, maintenance, performance difficulties and the like. In the event of a change in the Service Hours, CUSTOMER will provide PROVIDER with at least fifteen (15) calendar days written notice of such change.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.