Filling Concrete Blocks Joints Sample Clauses

Filling Concrete Blocks Joints. Supply materials and filling concrete block joints in inner and outer sides of the wall. All block gaps and block joints should be filled horizontally and vertically using ordinary Portland cement / sand and sand must be sieved before mixing it with cement and mortar should be with 1:3 ratio. Filled gaps should be smooth. Filling concrete blocks should be done according to instructions of site engineer. m2 1 5 Gypsum plaster: Internal plastering with gypsum in two layers at least, each layer min. of 15 mm thickness for walls with approved gypsum, the wall and ceiling to be cleaned and splashed by cement- sand mortar prior of plastering. Final surface shall be clean, smooth and white, using checking wire width of 50 cm between different materials. Gypsum plastering should be done according to instructions of site engineer. m2 1
AutoNDA by SimpleDocs
Filling Concrete Blocks Joints. Supply materials and filling concrete block joints in inner and outer sides of the wall. All block gaps and block joints should be filled horizontally and vertically using ordinary Portland cement / sand and sand must be sieved before mixing it with cement and mortar should be with 1:3 ratio. Filled gaps should be smooth. Filling concrete blocks should be done according to instructions of site engineer. m2 1 5 Gypsum plaster: Internal plastering with gypsum in two layers at least, each layer min. of 15 mm thickness for walls with approved gypsum, the wall and ceiling to be cleaned and splashed by cement- sand mortar prior of plastering. Final surface shall be clean, smooth and white, using checking wire width of 50 cm between different materials. Gypsum plastering should be done according to instructions of site engineer. m2 1 6 Cement Plastering: Plastering the internal walls & ceilings with 2 layers of cement: sand(smooth) mix (1:3) , with taking into consideration the verticality and alignment of the surfaces according to the technical specifications, the work includes fixing wire mesh over the steel lintels of doors and windows and watering. If applicable. Cement plastering should be done according to instructions of site engineer. m2 1 7 Cement Re-Plastering: Remove worn-out old plaster (or any other finishing) & repair all cracks in the wall and ceiling and steel bars if needed if found by using (chicken mesh) , surface should be dry before re-plastering, then Re-plastering the internal walls & ceilings with 2 layers of cement: sand(smooth) mix (1:3) , with taking into consideration the verticality and alignment of the surfaces according to the technical specifications. If applicable. Cement re-plastering should be done according to instructions of site engineer. m2 1 8 Bitumen Layer: Spreading a layer of bitumen layer (Isogam layer), Isogam should be done according to instructions of site engineer. m2 1 C Roof Works 1 Sandwich panel Roofing: Fix a new sandwich panel (thickness 5cm) roof fixed on 3” and thickness 3mm steel channels fixed on the walls and in the middle of the roof as support (maximum span between the supports 1.7 m), which should be raised to give the required slope using T shape rods (as described in SOW). Where necessary, install rain water drains to drain water collected over roofs to prevent water draining to adjacent roofs. Drainage should be done using Galvanic sheet shaped into a U-shaped channel and connected with PVC pipe 3" ...

Related to Filling Concrete Blocks Joints

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Vendor Encouraging Members to bypass TIPS agreement Encouraging entities to purchase directly from the Vendor or through another agreement, when the Member has requested using the TIPS cooperative Agreement or price, and thereby bypassing the TIPS Agreement is a violation of the terms and conditions of this Agreement and will result in removal of the Vendor from the TIPS Program.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • SERS PICK-UP A. For purposes of this Article, total annual salary and salary per pay period for each member shall be the salary otherwise payable under this Agreement, as amended. The total annual salary and salary per pay period of each member shall be payable by the Board in two parts: (1) deferred salary and (2) cash salary. A member’s deferred salary shall be equal to that percentage of said member’s total annual salary or salary per pay period which is required from time to time by the State Employment Retirement System (“SERS”) to be paid as an employee contribution by said member and shall be paid by the Board to SERS on behalf of said member as a “pickup” of the SERS employee contribution otherwise payable by said member. A member’s cash salary shall be equal to said member’s total annual salary or salary per pay period less the amount, subject to applicable payroll deductions, to said member. The Board’s total combined expenditures for members’ total annual salaries otherwise payable under this Agreement, as amended, (including pickup amounts) and its employer contributions to SERS shall not be greater than the amounts it would have paid for those items had this provision not been in effect.

  • Loop Provisioning Involving IDLC 2.16.1 Where TWTC has requested an Unbundled Loop and AT&T uses IDLC systems to provide the local service to the customer and AT&T has a suitable alternate facility available, AT&T will make such alternative facilities available to TWTC. If a suitable alternative facility is not available, then to the extent it is technically feasible, AT&T will implement one of the following alternative arrangements for TWTC (e.g., hairpinning):

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!