Final Baseline Ballpark Program and Minimum Design Parameters Sample Clauses

Final Baseline Ballpark Program and Minimum Design Parameters. The Padres have submitted to the City, pursuant to the MOU, the Final Baseline Ballpark Program and Minimum Design Parameters. Any substantive modifications to the Final Baseline Ballpark Program or the Minimum Design Parameters attached hereto as Exhibits D and E, respectively, must be pursuant to a Change Order approved in accordance with Section 4.04. If a Change Order is approved in accordance with Section 4.04 that modifies the Final Baseline Ballpark Program and Minimum Design Parameters, such modifications shall automatically be deemed incorporated into and become part of the Final Baseline Ballpark Program and Minimum Design Parameters for purposes of the MOU and this Agreement and Exhibits D and E shall automatically be deemed to have been amended to reflect such modification. The Final Baseline Ballpark Program and Minimum Design Parameters are intended to establish the minimum programmatic and qualitative standards for the Ballpark Project and the Padres, and, subject to Section 4.04, PCL shall have the right to exceed such minimum standards at their discretion without City approval.
AutoNDA by SimpleDocs

Related to Final Baseline Ballpark Program and Minimum Design Parameters

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Project Timeline The Project Timeline establishes a start and end date for each Phase of the Project. Developed during the Initiate & Plan Stage and revised as mutually agreed to, if needed, the timeline accounts for resource availability, business goals, size and complexity of the Project, and task duration requirements.

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Annual Work Plans (a) The Recipient shall prepare in accordance with guidelines acceptable to the Association and furnish to the Association not later than March 31 in each calendar year, a proposed annual work plan and budget for the Project for the following fiscal year of the Recipient, of such scope and in such detail as the Association shall reasonably request.