FIRST FLOOR Sample Clauses

FIRST FLOOR. Bedroom 1 4.61m x 4.32m (15’1” x 14’2”) with radiator and decorative fireplace En-suite Bathroom 4.29m x 1.98m (14’1” x 6’5”) with xxxxxx socket, wc, 6ft bath and wash hand basin Bedroom 2 (clothes room) 4.28m x 3.93m (14’1” x 12’11”) with radiator, decorative fire and cupboard Bedroom 3 4.21m x 3.58m (13’10” x 11’9”) with decorative fire and radiator Bathroom 2.43m x 1.52m (8’ x 5’) with wash hand basin, xxxxxx point and radiator WC 1.76m x 0.91m (5’8” x 3’) Bedroom 4 3.85 x 3.73m (12’8” x 12’3”) with radiator, decorative fire and built-in cupboard Airing Cupboard 1.21m x 1.16m (4’ x 3’8”) Landing 11.88m x 1.22m (39’6” x 4’) Hall 2.04m x 6.58m (6’7” x 21’6”) Bedroom 5 4.95m x 3.44m (16’3” x 11’3”) L shaped room with radiator, decorative fire and built-in cupboard Bedroom 6 5.03m x 3.15m (16’6” x 10’4”) with radiator, large walk-in cupboard and two doors WC 1.67m x 1.13m (5’5” x 3’7”) Bedroom 7 4.17m x 2.56m (13’8” x 8’5”) with radiator Shower Room 2.92m x 1.77m (9’6” x 5’8”) with airing cupboard
AutoNDA by SimpleDocs
FIRST FLOOR. Landlord shall deliver the first floor portion of the Premises in its “AS IS” condition; Tenant shall be responsible for building out the first floor portion of the Premises pursuant to final, approved plans and working drawings (the “First Floor Plans”). The First Floor Plans shall include Tenant’s Special Compartmented Information Facility (SCIF).
FIRST FLOOR. The first floor has 4 training rooms. There are two large training rooms that are approximately 460sqft and 730sqft. The other two medium size rooms are approximately 290sqft and 280sqft, respectively. A unisex, disabled toilet facility is located centrally to the 4 rooms.
FIRST FLOOR. To the first floor of the property is a store room/office area with closed circuit television monitor and two chest freezers. In addition we are informed that a large room is sub let to a vertical blind company. W.C. Part tiled around with w.c. and hand wash basin.
FIRST FLOOR. BEDROOM ONE 15' 9" x 10' 2" (4. 8m x 3.1m) EN SUITE SHOWER ROOM 4' 11" x 6' 7" (1.5m x 2.01m) BEDROOM TWO 13' 3" x 10' 3" (4.04m x 3.12m) BEDROOM THREE 11' 6" x 11' 1" (3.51m x 3.38m) BEDROOM FOUR 9' 2" x 8' 6" (2. 79m x 2.59m) BATHROOM FLOOR PLAN SITE PLAN GENERAL INFORMATION Subjective comments in these details imply the opinion of the selling Agent at the time these details were prepared. Naturally, the opinions of purchasers may differ.
FIRST FLOOR. SCALE:1/16" = 1'-0" XXXXXX XXXXXXX XXXXX architects, inc. 000 Xxxxxx Xxxxxx • Mount Pleasant, SC • 29464 000 000 0000 • 000 000 0000 fax • xxx.xxxx.xxx RIVERVIEW CHARTER SCHOOL NEW ADDITION NEW FLOOR PLAN PROJECT NO: 1508 ISSUE DATE: 7/17/15 PLOTTED: 8/3/15 SHEET NO: 03 2 MIDDLE SCHOOL & GYM NORTH ELEVATION SCALE:1:0.84 3 MIDDLE SCHOOL & GYM SOUTH ELEVATION SCALE:1:0.84 1 MIDDLE SCHOOL & GYM EAST ELEVATION SCALE:1:1.32 MIDDLE SCHOOL & GYM WEST ELEVATION SCALE:1:1.32 XXXXXX XXXXXXX XXXXX architects, inc. 000 Xxxxxx Xxxxxx • Mount Pleasant, SC • 29464 000 000 0000 • 000 000 0000 fax • xxx.xxxx.xxx RIVERVIEW CHARTER SCHOOL NEW ADDITION MIDDLE SCHOOL ELEVATIONS PROJECT NO: 1508 ISSUE DATE: 7/17/15 PLOTTED: 8/3/15 SHEET NO: 10 Architect: Xxxxxx Xxxxxxx Xxxxx Architects 000 Xxxxxx Xxxxxx Mount Pleasant, SC 29464 MASTER SUMMARY Schematic Design Estimate For Addition & Renovation Riverview Charter School Beaufort, South Carolina Cost Estimator: Aiken Cost Consultants 00 Xxxx Xxxxx Xxxxxx Xxxxxxxxxx, XX 00000 Total Cost % New Gym14,500 SF @ $275 per SF Renovation7,600 SF @ $89 per SF Sitework - Additional Parking 3,982,973 83.4% 677,118 14.2% 116,419 2.4% Total Probable Base Bid $4,776,511 100.0% Construction Phase Contingency 238,826 5.0% Total Construction Cost (TCC) $5,015,336 105.0% Project Notes / General Comments This estimate has been prepared in accordance with generally accepted estimating practices and principles. Aiken Cost Consultants' staff is available to discuss our methods, pricing, assumptions, or estimating philosophy with any interested party. Please contact us by phone at (000) 000-0000, by fax at (000) 000-0000, or by e-mail at Xxxx@XxxxxXxxx.xxx. Aiken Cost Consultants estimates are intended to be used as a professional opinion of the probable cost of construction, based on our understanding of the design at the time the estimate was prepared. We have no control over General or Subcontractor overhead and profit percentages, bidding climates, schedules, contractor's methods of determining prices, continuing design modifications or addenda, etc., therefore, we cannot guarantee that proposals, bids, or actual construction costs will be within a certain range of this, or subsequent, cost estimates. When preparing each cost estimate submittal Aiken Cost Consultants reviews current market conditions. It is our opinion that current construction market may be less than competitive at both the General Contractor and Sub Contractor levels. One of severa...
FIRST FLOOR. Facilities: cloak room; storage; toilet for men; toilet for women; kitchenette & rest area; printing & stationary area; lift (2 Nos.); plant room; shaft & riser; patch room; main stair case; emergency exit stair cases. - Administration & corporate secretary: CEO; administration manager; board room; appropriate workstation space. - Health Safety and Environment (HSE): appropriate workstation space. - Procurement: BPO manager; appropriate workstation space. - Marketing: presentation room; appropriate workstation space. - Training: training room with removable partition; appropriate workstation space. - Human Resource: HR manager; meeting room with removable partition; appropriate workstation space.
AutoNDA by SimpleDocs
FIRST FLOOR a. The elevator control panel is inaccessible because it does not contain Braille control indicators. Provide the required Brailled designations for control buttons. §§ 4.1.6(1)(b), 4.1.3(5), 4.10.12(2), 4.30.
FIRST FLOOR. If Tenant does not vacate the first floor of the premises by April 1, 2012, then Tenant shall pay additional rent for its occupancy of the first floor, at $40,500 per month, until the first floor is vacated. Tenant shall promptly notify landlord of its vacation of the occupancy of the first floor. Said additional rent shall cease on the date that Tenant provides such notice or on the date that the first floor is vacated, whichever is later.
FIRST FLOOR. In August 1997, during the original term of the Lease, the parties added to the Premises Nine Hundred Twenty One (921) square feet on the first floor of the Premises as outlined in Exhibit A attached hereto and incorporated herein by this reference (“First Floor Additional Premises”), at a rate of $17.00 per square foot. The parties hereby ratify the First Floor Additional Premises and hereby amend the Lease to include the First Floor Additional Premises. All rental payments due for the First Floor Additional Premises under the original term of the Lease have been paid and there are no amounts due and owing. Lessee accepts the First Floor Additional Premises in “AS IS” condition.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!