FUTURE COSTS FOR VILLAGE FY 2019/2020 Sample Clauses

FUTURE COSTS FOR VILLAGE FY 2019/2020. SGPP and Honeywell have agreed to pay, and the Village has agreed to accept, a lump sum payment of $70,000 as full and adequate consideration for the costs (“Costs”) to be incurred by the Village in connection with the day-to-day operations of the GAC system and routine preventative maintenance. The term Costs shall mean personnel costs, engineering and consultant costs, interest charges, mailings and postage due to the presence of PFOA in the Village Water Supply System in the Village’s FY 2019/2020. Upon receipt of payment as set forth in this Paragraph C, the Village agrees not to assert any claim for Costs incurred during FY 2019/2020. The Parties further agree that such Costs do not include, and SGPP and Honeywell will separately fund, non-routine sampling of the GAC system and non-routine repairs to the system due to equipment malfunctions, required modifications to the system approved and incorporated into the GAC Protocol Work Plan, and carbon change-outs.
AutoNDA by SimpleDocs

Related to FUTURE COSTS FOR VILLAGE FY 2019/2020

  • Service Costs Service Costs are direct and indirect expenditures incurred in support of Petroleum Operations in the Contract Area, including expenditures on warehouses, piers, marine vessels, vehicles, motorized rolling equipment, aircraft, fire and security stations, workshops, water and sewerage plants, power plants, housing, community and recreational facilities and furniture and tools and equipment used in these activities. Service Costs in any Year shall include the costs incurred in such Year to purchase and/or construct the said facilities as well as the annual costs of maintaining and operating the same, each to be identified separately. All Service Costs shall be regularly allocated as specified in Sections 2.2.5, 2.3.5 and 2.4 to Exploration Costs, Development Costs and Production Costs and shall be separately shown under each of these categories. Where Service Costs are made in respect of shared facilities, the basis of allocation of costs to Petroleum Operations hereunder shall be specified.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Sub-projects 1. The Participating Bank shall make Sub-loans to Beneficiaries and appraise, review, approve, and supervise Sub-projects in accordance with the criteria, conditions and procedures set forth in the Operations Manual, including, inter alia, the following eligibility criteria:

  • Training Costs All costs and expenses incurred by the Contractor in training as is required under Article 22 of the Contract.

  • Price Adjustments for OGS Centralized Contracts Periodic price adjustments will occur no more than twice per year on a schedule to be established solely by OGS. Pricing offered shall be fixed for the first twelve (12) months of the Contract term. Such price increases will only apply to the OGS Centralized Contracts and shall not be applied retroactively to Authorized User Agreements or any Mini-bids already submitted to an Authorized User. Price Decreases Price decreases may be made at any time. Additionally, some price decreases shall be calculated in accordance with Appendix B, section 17, Pricing.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Weighing and Scaling Costs Purchaser agrees to pay for all weighing costs for logs delivered regardless if logs are purchased on a weight or scale basis. In addition, Purchaser agrees to pay for all scaling costs for logs delivered on a scale basis. Purchaser also agrees to pay for all costs associated with the transmission and reporting of scale or weight data.

  • Overall Project Schedule The Construction Progress Schedule that is approved by the Owner.