Generator Protective Device Sample Clauses

Generator Protective Device. The generator protective device must detect power outages and disconnect the Generator from the distribution system automatically during an outage so as not to cause islanding if it is unable to ride-through the frequency or voltage event in accordance with Section 1.5.7. Such protective devices must be such that they communicate with or otherwise coordinate with the Cooperative’s protective devices, and the Interconnection Customer shall notify the Cooperative of any proposed changes in settings. The generator protective equipment shall allow for Cooperative personnel to install grounds on the line during emergencies and power outages. As set forth elsewhere in this Agreement, Cooperative shall give Interconnection Customer reasonable notice of the possible isolation of Interconnection Customer's premises and/or Generator from Cooperative's System.
AutoNDA by SimpleDocs

Related to Generator Protective Device

  • Protective Devices Protective devices, wearing apparel, and other equipment necessary to protect employees from injury shall be provided by the County in accordance with practices now prevailing or as such practices may be improved from time to time by the County.

  • CONTRACTOR PORTABLE DEVICES Contractor shall not place Data on any portable Device unless Device is located and remains within Contractor’s CONUS Data Center. For Authorized Users subject to ITS policies, the Data, and/or the portable device containing the Data, shall be destroyed in accordance with applicable ITS destruction policies (ITS Policy S13-003 Sanitization/Secure Disposal and S14-003 Information Security Controls or successor) when the Contractor is no longer contractually required to store the Data. TRANSFERRING OF DATA General Except as required for reliability, performance, security, or availability of the services, the Contractor will not transfer Data unless directed to do so in writing by the Authorized User. All Data shall remain in CONUS. At the request of the Authorized User, the Contractor will provide the services required to transfer Data from existing Databases to physical storage devices, to facilitate movement of large volumes of Data. The Authorized User may require several Cloud providers to share or transfer Data for a period of time. This will be provided for in the Authorized User Agreement or shall be assumed to be limited to a six month duration. Transfer of Data at End of Contract and/or Authorized User Agreement Term At the end of the Contract and/or Authorized User Agreement term, Contractor may be required to facilitate transfer of Data to a new Contractor. This transfer must be carried out as specified by the Authorized User in the Authorized User Agreement. Transfer of Data; Charges Contractor cannot charge for the transfer of Data unless the charges are provided for in response to an Authorized User RFQ. Transfer of Data; Contract Breach or Termination Notwithstanding Section 3.6.3, in the case of Contract breach or termination for cause of the Contract, all expenses for the transfer of Data shall be the responsibility of the Contractor.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Mobile Devices Mobile devices which are issued by and belonging to the Contractor for purposes of processing Personal Data should have access control measures and remote wipe capability turned on. Procedures should be in place to report and wipe data off lost mobile devices immediately after detection of loss.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Signaling protocol The Parties will interconnect their networks using SS7 signaling where Technically Feasible and available as defined in GR 905 Telcordia Standards including ISDN User Part (ISUP) for trunk signaling and TCAP for CCS-based features in the Interconnection of their networks. All Network Operations Forum (NOF) adopted standards shall be adhered to. Where available, CenturyLink signaling services to link its Signaling Transfer Points (STPs) for CLEC switches which connect to CenturyLink’s STPs via “A” links or for CLEC’s STPs to connect to CenturyLink’s STPs via “D” links which are dedicated to the transport of signaling for local Interconnection, may be ordered from the CenturyLink Tariff.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.