Governor and Control System Sample Clauses

Governor and Control System. The turbine(s), generator and associated equipment shall be equipped with control features designed to go to the safe position on loss of power or compressed air, (i.e. "Fail Safe"). Routine control shall be from the GGC, however control shall also be possible from the Local Control Room. Each turbine shall be fitted with a vibration sensor. The emergency stop valves (ESVs) and Governor valves shall be separate items. There shall be two independent overspeed systems and a load limiter for protecting against an over-pressurised turbine inlet. Interlocks and disabling switches shall be supplied as necessary to by-pass or disable trips and alarms for the purpose of starting up the turbine-generator and for routine and statutory testing. The overspeed trip shall never be disabled. In general, interlocks shall be provided wherever incorrect operating sequences could result in damage or injury.
AutoNDA by SimpleDocs

Related to Governor and Control System

  • Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract. (b) Records of all quality control inspection work by SELLER shall be kept complete and available to LOCKHEED XXXXXX and its customers.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • ELECTRONIC WORKFLOW SYSTEM OGS reserves the right to incorporate an electronic workflow system that may include elements of the Authorized User RFQ process. OGS reserves the right to post Authorized User Contract usage of Centralized Contracts. For Lot 4 only, when provided for in the RFQ and resultant Authorized User Agreement, the Authorized Users may reimburse travel expenses. All rules and regulations associated with this travel can be found at xxxx://xxx.xxxxx.xx.xx/agencies/travel/travel.htm. In no case will any travel reimbursement be charged that exceeds these rates. All travel will be paid only as specified within the Authorized User Agreement and must be billed with the associated services on the same Invoice with receipts attached. The Contractor shall receive prior approval from the Authorized User for any travel that occurs during the term of an Authorized User Agreement. Parking fees and/or parking tickets shall not be paid by an Authorized User. Unless otherwise specified in writing by the Authorized User, a vehicle will not be provided by Authorized User to the Contractor for travel. Therefore, the Contractor will be responsible for ensuring that the Contractor has access to an appropriate vehicle (e.g., personal vehicle or rental vehicle) or common carrier with which to carry out any necessary travel. For the Contractor to obtain reimbursement for the use of a rental vehicle, such use must be justified as the most cost- effective mode of transportation under the circumstances (including consideration of the most effective use of time). The Contractor is responsible for keeping adequate records to substantiate any claims for travel reimbursement. All services provided under the resultant Authorized User Agreement must be performed within CONUS. There are no BONDS for this Contract. However, an Authorized User may require in an RFQ a performance, payment or Bid bond, or negotiable irrevocable letter of credit or other form of security for the faithful performance for the resultant Authorized User Agreement. Pursuant to New York State Executive Law Article 15-A and Parts 140-145 of Title 5 of the New York Codes, Rules and Regulations (“NYCRR”), the New York State Office of General Services (“OGS”) is required to promote opportunities for the maximum feasible participation of New York State-certified Minority- and Women-owned Business Enterprises (“MWBEs”) and the employment of minority group members and women in the performance of OGS contracts.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Electronic and Information Resources Accessibility and Security Standards a. Applicability: The following Electronic and Information Resources (“EIR”) requirements apply to the Contract because the Grantee performs services that include EIR that the System Agency's employees are required or permitted to access or members of the public are required or permitted to access. This Section does not apply to incidental uses of EIR in the performance of the Agreement, unless the Parties agree that the EIR will become property of the State of Texas or will be used by HHSC’s clients or recipients after completion of the Agreement. Nothing in this section is intended to prescribe the use of particular designs or technologies or to prevent the use of alternative technologies, provided they result in substantially equivalent or greater access to and use of a Product.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).

  • Electronic Access Access by the Customer to certain systems, applications or products of Bank shall be governed by this Agreement and the terms and conditions set forth in Annex A Electronic Access.