Control Room. For new substation, substation control room shall be provided to house substation work stations for station level control (SAS) alongwith its peripheral and recording equipment, AC & DC distribution boards, DC batteries & associated battery chargers, Fire Protection panels, Telecommunication panels & other panels as per requirements. Air conditioning shall be provided in the building as functional requirements. Main cable trenches from the control room shall have adequate space provision for laying of cables from control room for all the future bays also. At existing substations, the adequacy of size of control room shall be ascertained and the same shall be augmented as per requirement.
Control Room. A location where the line control, signalling control and traction current control (on some lines) functions are carried out in an integrated manner.
Control Room. At existing substations, the adequacy of size of control room shall be ascertained and the same shall be augmented as per requirement.
Control Room. Integrates all internal and external security communications networks within a secure room. Activities conducted within the control room have a critical impact on the institution's orderly and secure operation.
Control Room. In addition to installing the Equipment, the Project SPV shall set up a control room with CCMS to monitor and operate the Greenfield Public Street Lighting System in the space provided by the Authority pursuant to Clause 2.2(c)(i). The Project SPV shall set up the control room within thirty (30) Days of execution of the Amendment Agreement. The control room shall be used solely for the purposes of monitoring and operating the Greenfield Public Street Lighting System. The Project SPV shall at its own cost be responsible for upkeep and maintenance of the control room during the Term.
Control Room. 37.1 A Venue must provide a central control room, for Venue security and police to oversee Match security and monitor ingress and egress. It must have monitors for a television surveillance system ensuring an overall view of the inside of the Venue as well as equipped with communication facilities.
37.2 The CCTV system cameras are to be recorded and records of total hire period should be made available to NRL on request. The CCTV system should also have the capacity to view and identify each individual attendee and seating location
Control Room. A Control Room shall be constructed to house Protection and Control panels as well as communications equipment and Auxiliary supply equipment belonging to KPLC. The Control Room shall have the following areas: Protection Panels area Communication equipment area 110 V & 48 V DC Charger area 110 V & 48 V DC Battery area The designated areas shall be approximately sized to accommodate the respective equipments.
Control Room. A high level control room, located over part of the substation, houses the control console which controls, and indicates on a mimic diagram, the functioning of all the pumps and syphon-breaker valves. It also houses the gate winch controls, the filling valve controls, lighting controls and serves as a communication centre with public address, telephone and radio communications. The control room is in a position to provide monitoring and control of access to the pumproom.
Control Room. At minimum, the building should provide a two-hour fire resistance (typically concrete block with brick facing, minimal wired glass windows and fire-rated doors). Due to proximity to neighboring units and depending on the insurance company's position, some level of blast resistance may be required. Once building construction is agreed upon, the following fire protection should be provided:
(a) At minimum, smoke detection throughout, with alarms locally and audible in a constantly attended location.
(b) Fire protective cable coating and firestopping for significant electrical cable accumulations. Automatic suppression -- sprinkler or gas suppression system -- is an option if cable loading is significant.
(c) If support areas (offices, labs, etc.) contain a combustible occupancy, automatic sprinkler or other appropriate protection should be provided.
Control Room. Contractor will design and construct the Facilities with a single central control room (CCR). Primary operator interface with process controls and safety instrumented systems is to be in the CCR. Engineering work stations for maintenance of process control and safety instrumented systems will be in the same building as the CCR.