Packaging and Shipping All shipping containers shall be packed and packaged to: (i) ensure safe arrival to final destination; (ii) secure the lowest transportation costs;(iii) comply with requirements of common carriers; (iv) meet Buyer's written instructions; and (v) meet the requirements of all applicable laws, ordinances, rules and regulations.
Packaging and Labeling Seller shall properly xxxx, xxxx, and ship Goods and provide Buyer with shipment documentation showing the Order number, Seller’s identification number for the subject Goods, the quantity of goods in shipment and the number of cartons or containers in the shipment.
PACKING AND SHIPPING a. Seller shall pack the goods and materials to prevent damage and deterioration. Unless otherwise set forth in this Contract, Seller shall package the goods in accordance with the requirements of Boeing Document D37522-6 “Supplier Packaging”. Buyer may charge Seller for damage to or deterioration of any goods resulting from improper packing or packaging. b. If the Contract specifies FOB destination (place of delivery), then in addition to any other shipping instructions, Seller shall forward goods freight prepaid. Seller shall make the transportation arrangements, pay the shipping costs, and remain responsible for the goods and materials until the goods and materials are delivered and the Buyer takes possession at the destination. c. If the Contract specifies FOB origin (place of shipment), then in addition to any other shipping instructions, Seller shall forward goods collect. For goods shipped within the United States, Seller shall make no declaration concerning the value of the goods shipped except on goods where the tariff rating is dependent upon released or declared value. In such event, Seller shall release or declare such value at the maximum value within the lowest rating. Seller will ship the goods in accordance with the provisions set forth in the Boeing Domestic Shipment Routing Guide to be accessed through Buyer’s supplier portal at xxxxx://xxxxxx.xxxxxxx.xxx/. Sellers need a One Time Password (OTP) token to log into the Boeing Supplier Portal. Upon Xxxxx’s request, Seller will identify packaging charges showing material and labor costs for container fabrication. d. Seller shall provide with each container shipped under this Contract an Advanced Shipping Notice (“ASN”). For each container shipped, Seller shall provide two (2) readable copies of the ASN barcode as follows: one (1) copy is to be securely affixed to the outside of each container and one (1) copy is to be loose inside each container. Non- conforming shipments are subject to rejection and repackaging at Seller’s expense. Instructions and guidelines related to the ASN process can be found on the Boeing Supplier Portal. Seller shall access by selecting the “Enterprise ASN Instructions” hyper-link under the header “Exostar Resources”. A copy of these instructions can also be found at xxx.xxxxxxx.xxx.
PACKING AND SHIPMENT (a) Unless otherwise specified, all Work is to be packed in accordance with good commercial practice. (b) A complete packing list shall be enclosed with all shipments. SELLER shall mark containers or packages with necessary lifting, loading, and shipping information, including the LOCKHEED XXXXXX Contract number, item number, dates of shipment, and the names and addresses of consignor and consignee. Bills of lading shall include this Contract number. (c) Unless otherwise specified, delivery shall be FOB Place of Shipment.
Shipping Axon may make partial shipments and ship Axon Devices from multiple locations. All shipments are FOB shipping point via common carrier. Title and risk of loss pass to Agency upon Axon’s delivery to the common carrier. Agency is responsible for any shipping charges in the Quote.
Packaging Tangible product shall be securely and properly packed for shipment, storage, and stocking in appropriate, clearly labeled, shipping containers and according to accepted commercial practice, without extra charge for packing materials, cases, or other types of containers. All containers and packaging shall become and remain Customer’s property.
Packing 3.9.1 The tenderer shall provide such packing of the Goods as is required to prevent their damage or deterioration during transit to their final destination, as indicated in the Contract. 3.9.2 The packing, marking, and documentation within and outside the packages shall comply strictly with such special requirements as shall be expressly provided for in the Contract
Labelling The distributor, on behalf of the selected vendor agrees that all supplies of articles should invariably contain the following information on its label and the carton. One information should not be overlapped by any other information needed to be furnished. The label should contain : a. Name of the item as approved b. CMS Cat. No. c. Manufacturing date/Import date for the imported items. d. Expiry Date. (where applicable) e. Name & address of Registered Office of Manufacturers and place of manufacture. f. Manufacturing License Number. (where applicable for Manufactures) g. Batch Number (where applicable) h. Month and Year of supply. i. The label & Carton must invariably marked “W B. GOVT SUPPLY : NOT FOR SALE”. j. All Surgical items quoted/supplied by the tenderer must conform to IS /BIS /CE/USFDA. Pacemker must conform to CE & US FDA norms. In case of Drugs items quoted /supplied by tenderer MUST CONFORM TO IP, BP, or USP norms and N.F.I. –III specification as noted against the item(s) in catalogue as applicable. k. The MRP and Trade Name will not be allowed to be printed in any pack. This will lead to cancellation of candidature straightaway. However, for excisable products, insertion of writing of Govt MRP is allowed as per provision laid down in the order of the Central Excise dept. However, for imported item(s), MRP and Trade name may be allowed in addition to Generic name.
DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.
SHIPPING AND SHIPPING COSTS All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities. Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity. Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition. Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.