Heat Stress Monitoring Plan The Sample Clauses

Heat Stress Monitoring Plan The. Contractor shall develop a heat stress monitoring plan to include elements addressed in paragraph 06.I.02 of EM 385-1-1.
AutoNDA by SimpleDocs

Related to Heat Stress Monitoring Plan The

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic County PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than twenty-four (24) hours.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Innovative Scheduling Schedules which are inconsistent with the Collective Agreement provisions may be developed in order to improve quality of working life, support continuity of resident care, ensure adequate staffing resources, and support cost-efficiency. The parties agree that such innovative schedules may be determined locally by the Home and the Union subject to the following principles: (a) Such schedules shall be established by mutual agreement of the Home and the Union; (b) These schedules may pertain to full-time and/or part-time employees; (c) The introduction of such schedules and trial periods, if any, shall be determined by the local parties. Such schedules may be discontinued by either party with notice as determined through local negotiations; (d) Upon written agreement of the Home and the Union, the parties may agree to amend collective agreement provisions to accommodate any innovative unit schedules; (e) It is understood and agreed that these arrangements are based on individual circumstances and each agreement is made on a without prejudice or precedent basis. (f) It is understood and agreed that these arrangements can be utilized for temporary job postings for seasonal coverage (e.g. weekend workers, etc.).

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!