Historical Designation Sample Clauses

Historical Designation. Neither Landlord nor Tenant shall designate, cause any Person to designate, submit or support any application to designate, the Premises or any Improvements as a federal, state or local historical landmark or as a historical resource, without the other Party's prior written consent, which may be withheld by such other Party in its sole and absolute discretion. The terms of this Section 6.9 shall survive the expiration or earlier termination of this Lease.
AutoNDA by SimpleDocs

Related to Historical Designation

  • Timber Designations Timber designated for cutting shall be confined to Sale Area, except as provided in B2.131, B2.14, B2.15, B2.32, and B5.1. Sale Area Map indicates subdivisions, if any, where Marking under B2.35 is to be done after timber sale advertisement, except for construction clearing under B2.32, minor changes under B2.37, and damaged timber. The boundaries of Clearcutting Units, Overstory Re- moval Units, and Understory Removal Units were plainly Marked on ground before timber sale advertisement and are shown on Sale Area Map. Boundary trees shall not be cut. The number of units and approximate acreage of timber designations are stated in A3.

  • Filing Designation The City Department Director will designate each individual who will be providing services to the City pursuant to the Agreement as full disclosure, limited disclosure, or excluded from disclosure, based on an analysis of the services the Consultant will provide. Notwithstanding this designation or anything in the Agreement, the Consultant is ultimately responsible for complying with FPPC regulations and filing requirements. If you have any questions regarding filing requirements, please do not hesitate to contact the City Clerk at (000)000-0000, or the FPPC at 0-000-XXX-XXXX, or (000) 000-0000 *2. Pursuant to the duly adopted City of Chula Vista Conflict of Interest Code, this document shall serve as the written determination of the consultant’s requirement to comply with the disclosure requirements set forth in the Code.

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Teachers with Principal Designations (Effective October 22, 2019, the following repeals and replaces clause 4.4. above)

  • Designation of Key Personnel The Contractor’s Contract Manager for this engagement shall be Xxxxxxx Xxxxxxx, Phone: (000) 000-0000, Email Address: xxxxxxx@xxxxxxxxxx.xxx. The City’s Contract Manager for the engagement shall be Xxx Xxxxx, Phone: ( 512 ) 974 - 8211 , Email Address: Xxx.Xxxxx@xxxxxxxxxxx.xxx. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor will promptly notify the City Contract Manager and obtain approval for the replacement. Such approval shall not be unreasonably withheld.

  • Written Designation The Owner shall designate, in writing, a representative authorized to act on the Owner's behalf with respect to the Project. The Owner hereby designates the party identified in the Contract as its initial authorized representative and reserves the right to designate additional or replacement representatives by written notice to the Contractor.

  • Training Designation Type Code Select and insert the appropriate training credit designation type code: Code Short Description Long Description (If Applicable) 01 Undergraduate Credit N/A 02 Graduate Credit N/A 03 Continuing Education Unit N/A 04 Post Graduate Credit N/A 05 N/A N/A

  • Industrial Designs 5. Patents

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

Time is Money Join Law Insider Premium to draft better contracts faster.