Horizontal and Vertical Control Surveys (Project Control) Sample Clauses

Horizontal and Vertical Control Surveys (Project Control). The maximum distance between control points shall not exceed 1500 feet. The coordinate location and elevation of control points or center panel points based on GPS surveys conducted by the Surveyor shall meet standards of accuracy as set forth below. Reference may be made to standards of accuracy for First Authorization surveys as described in the Federal Geodetic Control Committee publication entitled Geometric Geodetic Accuracy Standards and Specifications for Using GPS Relative Positioning Techniques. The accuracy standard at the 95 percent confidence level for First Authorization Surveys may be calculated using the formula s= maximum allowable error in centimeters d= distance in kilometers between any two stations p= the minimum geometric relative position accuracy standard in parts per million (10 ppm) e= base error in centimeters (1.0 cm.)
AutoNDA by SimpleDocs
Horizontal and Vertical Control Surveys (Project Control). The maximum distance between control points shall not exceed 1200 feet. The coordinate location and elevation of control points or center panel points based on GPS surveys conducted by the Engineer’s Surveyor shall meet TXDOT standards of accuracy. Reference may be made to standards of accuracy for First Authorization surveys as described in the Federal Geodetic Control Committee publication entitled Geometric Geodetic Accuracy Standards and Specifications for Using GPS Relative Positioning Techniques.
Horizontal and Vertical Control Surveys (Project Control). The coordinate location and elevation of control points or aerial panel points based on GPS surveys conducted by the Engineer’s Surveyor shall meet TXDOT standards of accuracy. Reference may be made to standards of accuracy for First Authorization surveys as described in the Federal Geodetic Control Committee publication entitled DocuSign Envelope ID: F795246C-ADAA-49FF-84F6-E875915354F1 Geometric Geodetic Accuracy Standards and Specifications for Using GPS Relative Positioning Techniques.

Related to Horizontal and Vertical Control Surveys (Project Control)

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Site Improvements The City may require a Developer to undertake site improvements upon completion of construction. Site improvements include, but are not limited to, seeding or sodding of front yards, and 4' chain-link fencing. Said site improvements must be undertaken when seasonally appropriate. The City reserves the right to make an exception on a case-by-case basis.