Hydraulic Calculations, Pump Selection and Operational Strategy Development Sample Clauses

Hydraulic Calculations, Pump Selection and Operational Strategy Development. This task will develop hydraulic calculations and pump selection for the existing force main system to include the design flow to meet DEQ requirements for velocity. Hydraulic calculations and pump selections will also be developed for alternative force main scenarios such as a smaller replacement or parallel force main that allows for pump station flows to match incoming design flows that are much less than the design flow needed for the currently oversized force main. These evaluations will be used to help the City determine how to best phase both pump station and force main upgrades in order to meet DEQ requirements now and in the future, and maximize the useful life of existing assets, while also replacing aging assets that may be at or near their design life. This task will include the following. ▪ Review design flow rates for existing and buildout conditions from the City’s Wastewater Collection System Master Plan and utilize these flow rates for hydraulic calculations and pump selections ▪ Develop force main options and pipe sizing for existing and buildout flows. ▪ Develop Total Dynamic Head System Curves for the existing force main and up to two (2) proposed alternative force main configurations ▪ Recommendations on pump configuration and sizing to meet projected flows and force main alternatives ▪ Preliminary sizing and layout for discharge piping, flow meter, wet-well, and valve vault structures
AutoNDA by SimpleDocs

Related to Hydraulic Calculations, Pump Selection and Operational Strategy Development

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Application and Operation Subject Matter Clause No.

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.

  • MONITORING OF OPERATION AND MAINTENANCE 19.1 Monthly status reports During Operation Period, the Concessionaire shall, no later than 7 (seven) days after the close of each month, furnish to the Authority and the Independent Engineer a monthly report stating in reasonable detail the condition of the Bus Terminal including its compliance or otherwise with the Maintenance Requirements, Maintenance Manual, Maintenance Programme and Safety Requirements, and shall promptly give such other relevant information as may be required by the Independent Engineer. In particular, such report shall separately identify and state in reasonable detail the defects and deficiencies that require rectification.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Financial Management, Financial Reports and Audits 1. The Recipient shall maintain or cause to be maintained a financial management system in accordance with the provisions of Section 4.09 of the General Conditions.

Time is Money Join Law Insider Premium to draft better contracts faster.