Image Quality Control Override Sample Clauses

Image Quality Control Override. If a fingerprint image is redisplayed for verification by the image quality control feature, but the operator determines that the image should be accepted, the operator must be able to manually override the image quality control feature and require the device to accept the image. Before this override is allowed, the operator must be prompted to re-roll the unacceptable finger(s) and/or plain impressions, and must not be allowed to override the rejection unless the operator has attempted to obtain acceptable prints a minimum of 2 times. In such cases, a manual override designation must be placed in the NIST record and printed on the card. (One acceptable method to place the override designation in the NIST record is to add it to the 2.124 field, with the “BIP” (best image possible) value. Other methods may be considered and approved.) A record log must be maintained for audit purposes. The log must indicate ORI, operator, date/time the override occurred, aspect of the image that was in question, and the transaction control number of the record that was produced.
AutoNDA by SimpleDocs

Related to Image Quality Control Override

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Image Quality You are responsible for the image quality of any Image that you transmit. If an Image that we receive from you or for deposit to your Account is not of sufficient quality to satisfy our image quality standards as we may establish them from time to time, we may reject the Image without prior notice to you. Each Image must include the front and back of the Item and the following information must be clearly readable: amount, payee name, drawer signature, date, check number, account number, routing and transit number, MICR (Magnetic Ink Character Recognition) line, and any endorsement or other information written on the check.

  • Service Quality The Transfer Agent shall maintain a quality control process designed to provide a consistent level of quality and timeliness for its call center, correspondence services and transaction processing.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!