IMPLANTATION SURVEY Sample Clauses

IMPLANTATION SURVEY. (a) The job will be to lay out lines on the surface, each of about 10-15 km length or as advised by OIL's representative, accurately using total stations or RTK DGPS. Since survey is most vital in 3D seismic survey and the trace line spacing is only about 300/400 meters or less and the shot line interval is only about 500 meters or less, no more than 1 meter of tolerance in every 1 km will be acceptable. The ground stations are to be properly marked on ground at every 50 meters in-line with a symbol, and every 100 meters in cross-line direction with a symbol at every 250-500 mtrs.
AutoNDA by SimpleDocs
IMPLANTATION SURVEY. (a) The job will be to lay out lines on the surface, each of about 10-15 km length or as advised by OIL's representative, accurately using total stations or GPS. Since survey is most vital in 2D seismic survey, no more than 1 meter of tolerance in every 1 km will be acceptable. The ground stations are to be properly marked on ground at every 20-25 meters for 240 channels as per OIL representative instruction in-line with a symbol.

Related to IMPLANTATION SURVEY

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Study Population ‌ Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months post enterostomy closure, following enterostomy closure (12-month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 month of overall study duration).

  • Geotechnical Engineer « »« » « » « » « » « »

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum.

  • FABRICATION Making up data or results and recording or reporting them.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!