MEASURING EQUIPMENT 1. Seller will maintain and operate, atlts own, expense and atthe point of delivery of gas hereunder, a meter or meters and othernecessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller. 2. Buyer agrees lo furnish to Seller electricity for operating Seller's meters, at not cost to Seller. 3. Buyer hereby grants to Seller suitable rlghts-0f-way and easements necessary or Incidental for the installatioo, maintenance, operation and removal of pipeline and other facilities together with rights ofingress thereto and egress there from at all times and hereby agrees to deliver to Seller, for the sum of one dollar ($1.00), an appropriate instrument or grant defining such rights and easements located on Buyer's planlslte. 4. Buyer may install, maintain and operate such check measuring equipment, Including arecording gravltometer and calorimeter as it shall desire, provided that such equipment shall be so installed so as not to Interfere with the operation of Seller's measuring equipment at or near the point of deliver. However, all xxxxxxxx to the Buyer shall be based on the metering of the Seller, subject only to the provisions of Paragraph 8 of this Article. 5. Each party shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, Inspecting, testing, calibrating, or adjusting done In connection with the other's measuring equlpme!lt used in measuring deliveries hereunder and each party shall advise the other of any Intended major maintenance operation sufficiently in advance in order that the other party may conveniently have its representative present. 6. All installatioo of measuring equipmenL applying to or effecting deliveries hereunder, shall be rnade in such manner as to perrnit an accurate detenninalion of the quantity of gas delivered and ready verification of the accuracy of measurement Orifice meter Installations, If used, shall oonforrn lo the recommendation for design and lnstallatioo contained in the Gas Measurement Commiltee Report No. 3 to the American Gas Association published April, 1955, and any modificatioos and amendments thereof and shall include the use of flange connections. 7. Measurement on Seller's meter or meters shall be conclusive of both parties except where the meter Is defective or fails to register, or if found in E)rror, in either of which case Seller shall repair or replace the meter and the quantity of gas delivered while the meter was out of order or failed to register shall be estimated: (a) By using the registration of any check meter If installed and accurately registering, or, In the absence of (a): (b) By correcting the error If the percentage of error by calibration, test or mathematical calculation, or, in the absence of both (a) and (b) then: (c) By estimating the quantity of delivery from deliveries during periods under similar oonditions when the meter was registering actUrately; and an appropriate billing adjusbnentshall be made In accordance with the current Rules and Regulations governing gas systems issued by the Commission. 8. Seller will maintain its meters in .good order and to this end Wiii make periodic tests of its meters pursuant to the current Rules and Regulations governing gas systems issued by the Commission, or at such shorter intervals as seem to Seller desirable. lfBuyer Is dissatisfied with the accuracy at eny time, it may call upon Seller to have Iha meter tested in accordance with all regulatioos relating to such tests and results of such tesls as found in the current Rules and Regulations governing gas systems issued by the Commission. 9. Each party shall preserve all records for aperiod of at least two (2) years.
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.
Changes in Equipment, Systems, Etc USBFS reserves the right to make changes from time to time, as it deems advisable, relating to its systems, programs, rules, operating schedules and equipment, so long as such changes do not adversely affect the services provided to the Trust under this Agreement.
Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.
Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)
Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).
Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.
Accessories, Spare Parts and Tools Accessories, spare parts and tools dispatched with a piece of equipment, machine, apparatus or vehicle, which are part of the normal equipment and included in the price thereof or which are not separately invoiced, shall be regarded as one with the piece of equipment, machine, apparatus or vehicle in question.
Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes. 3.8.2 The inspections and tests may be conducted in the premises of the tenderer or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination If conducted on the premises of the tenderer or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring entity. 3.8.3 Should any inspected or tested goods fail to conform to the Specifications, the Procuring entity may reject the equipment, and the tenderer shall either replace the rejected equipment or make alterations necessary to make specification requirements free of costs to the Procuring entity. 3.8.4 The Procuring entity’s right to inspect, test and where necessary, reject the goods after the Goods’ arrival shall in no way be limited or waived by reason of the equipment having previously been inspected, tested and passed by the Procuring entity or its representative prior to the equipment delivery. 3.8.5 Nothing in paragraph 3.8 shall in any way release the tenderer from any warranty or other obligations under this Contract.
Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.