Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct: (1) all storm sewers and accessories, including but not limited to catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the Manager, Urban Development, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage; (2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development; (3) all storm sewer service connections within the Development Area from the storm sewers to: (a) three and one half (3.5) metres inside the property line of each lot; or (b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development for the lane or road within which the storm sewer connection is to be installed; (4) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following: (a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and (b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and (5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installed. 6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 6 contracts
Samples: Master Residential Development Agreement, Master Industrial Development Agreement, Master Commercial Development Agreement
Installation. 6.01 5.01 The Developer, at its sole cost and expense, except as hereinafter providedotherwise provided in this Agreement, shall install and construct:
(1) all storm sanitary sewers complete with manholes and other accessories, including but not limited to catch basins pipes, fittings and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easementsgaskets, within the Development Area which may, in the opinion of the Manager, Urban Development, be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) all storm sanitary sewer service connections within the Development Area from the storm sanitary sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sanitary sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sanitary sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development for the lane or road within which the storm sanitary sewer connection is service connections are to be installed;; and
(43) a storm sanitary sewer service connection, extending connection from the storm sanitary sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sanitary sewer service connection to a School Site) within the Development Area Area, subject to the following:
(a) the location and size of the storm sanitary sewer service connection to a Community Association community association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installed.
6.02 5.02 The installation of any storm sanitary sewer service connection from the storm sanitary sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 6 contracts
Samples: Master Commercial Development Agreement, Master Residential Development Agreement, Master Industrial Development Agreement
Installation. 6.01 7.01 The DeveloperDeveloper shall, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) install all storm sewers water mains, valves, hydrants and accessoriesfittings, including but not limited to catch basins pressure reducing valve xxxxxxxx and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, appurtenances that in the opinion of the Manager, Urban Development, may be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not the said water mains are in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) install all storm sewer water service connections within the Development Area from the storm sewers water mains to:
(a) three and one half (3.5) metres meters inside the property line of each lot; or
(b) where the storm sewer water service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.05. 0) metres inside the property line of each lot where the requirements for the storm sewer water service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development for the lane or road within which the storm sewer water service connection is to be installed;
(4a) install a storm sewer single one hundred and fifty millimetre (150 mm) diameter water service connectionconnection and water meter box, extending which water meter box the City will install at no expense to the Developer, from the storm sewer water main to the property lineline of each and every:
(i) Sub-neighbourhood Park, to service a municipal Neighbourhood Park, Community Park , District Park and community association building site; and
(ii) excluding all School Sites and environmental reserve parcel (which shall not include a storm sewer service connection to a School Site) lands within the Development Area subject to the following:Area;
(ab) identify the location and size of the storm sewer water service connection to a the Community Association building site will site, which shall first be subject to approved by the approval Director of the Director, Water Resources and shall be shown on the approved Construction DrawingsDrawings and plans; and
(bc) the Director, Xxxxx shall provide to the Director, Water Resources with the sizing calculations as necessary; and
(54) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by for water mains and hydrants, disconnect any temporary water service connection(s) at the water main installed for any temporary irrigation system, all to the satisfaction of the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installedDevelopment.
6.02 7.02 The installation of any storm sewer water service connection from the storm sewer end of the water service connection to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 6 contracts
Samples: Master Residential Development Agreement, Master Commercial Development Agreement, Master Industrial Development Agreement
Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sewers and accessories, including but not limited to catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination;
(3) all storm sewer service connections within the Development Area from the storm sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer connection is to be installed;
(4) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following:
(a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road wherein the storm sewer service connections are to be installed.
6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 3 contracts
Samples: Master Development Agreement, Master Development Agreement, Master Development Agreement
Installation. 6.01 5.01 The Developer, at its sole cost and expense, except as hereinafter providedotherwise provided in this Agreement, shall install and construct:
(1) all storm sanitary sewers complete with manholes and other accessories, including but not limited to catch basins pipes, fittings and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easementsgaskets, within the Development Area which may, in the opinion of the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination, be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) all storm sanitary sewer service connections within the Development Area from the storm sanitary sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sanitary sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sanitary sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sanitary sewer connection is service connections are to be installed;; and
(43) a storm sanitary sewer service connection, extending connection from the storm sanitary sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sanitary sewer service connection to a School Site) within the Development Area Area, subject to the following:
(a) the location and size of the storm sanitary sewer service connection to a Community Association community association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installed.
6.02 5.02 The installation of any storm sanitary sewer service connection from the storm sanitary sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 3 contracts
Samples: Master Development Agreement, Master Development Agreement, Master Development Agreement
Installation. 6.01 7.01 The DeveloperDeveloper shall, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) install all storm sewers water mains, valves, hydrants and accessoriesfittings, including but not limited to catch basins pressure reducing valve xxxxxxxx and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, appurtenances that in the opinion of the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination, may be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not the said water mains are in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) install all storm sewer water service connections within the Development Area from the storm sewers water mains to:
(a) three and one half (3.5) metres meters inside the property line of each lot; or
(b) where the storm sewer water service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.05. 0) metres inside the property line of each lot where the requirements for the storm sewer water service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer water service connection is to be installed;
(4a) install a storm sewer single one hundred and fifty millimetre (150 mm) diameter water service connectionconnection and water meter box, extending which water meter box the City will install at no expense to the Developer, from the storm sewer water main to the property lineline of each and every:
(i) Sub-neighbourhood Park, to service a municipal Neighbourhood Park, Community Park , District Park and community association building site; and
(ii) excluding all School Sites and environmental reserve parcel (which shall not include a storm sewer service connection to a School Site) lands within the Development Area subject to the following:Area;
(ab) identify the location and size of the storm sewer water service connection to a the Community Association building site will site, which shall first be subject to approved by the approval Director of the Director, Water Resources and shall be shown on the approved Construction DrawingsDrawings and plans; and
(bc) the Director, Xxxxx shall provide to the Director, Water Resources with the sizing calculations as necessary; and
(54) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by for water mains and hydrants, disconnect any temporary water service connection(s) at the Managerwater main installed for any temporary irrigation system, Urban Development for all to the lane or road wherein satisfaction of the storm sewer service connections are to be installedManaging Director, Calgary Approvals Coordination.
6.02 7.02 The installation of any storm sewer water service connection from the storm sewer end of the water service connection to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 3 contracts
Samples: Master Development Agreement, Master Development Agreement, Master Development Agreement
Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sewers and accessories, including including, but not limited to to, catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the Manager, Urban DevelopmentDevelopment Engineering, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban DevelopmentDevelopment Engineering;
(3) all storm water reuse infrastructure including the reuse pumphouse, pump, and treatment, pipes and accessories conveying storm water from the storm pond to the Parks irrigation systems within the Development Area which may in the opinion of the Manager, Development Engineering be required;
(4) all storm sewer service connections within the Development Area from the storm sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development Engineering for the lane or road within which the storm sewer connection is to be installed;
(45) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following:
(a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources Community Planning and shall be shown on the approved Construction Drawings; and;
(b) the Director, Xxxxx Parks & Open Spaces shall provide to the Director, Water Resources Community Planning the sizing calculations as necessary; and
(5c) all storm sewer service connections from the storm sewers to the property line of all commercial, multi multi-family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development Engineering for the lane or road wherein the storm sewer service connections are to be installed.
6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 2 contracts
Samples: Development Agreement, Development Agreement
Installation. 6.01 5.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sanitary sewers complete with manholes and other accessories, including but not limited to catch basins pipes, fittings and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, gaskets within the Development Area which may, in the opinion of the Manager, Urban DevelopmentDevelopment Engineering, be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not in Boundary Roads and Lanes and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) all storm sanitary sewer service connections within the Development Area from the storm sanitary sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sanitary sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot lot, where the requirements for the storm sanitary sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development Engineering for the lane or road within which the storm sanitary sewer connection is service connections are to be installed;; and
(43) a storm sanitary sewer service connection, extending connection from the storm sanitary sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sanitary sewer service connection to a School Site) within the Development Area Area, subject to the following:
(a) the location and size of the storm sanitary sewer service connection to a Community Association community association building site will be subject to the approval of the Director, Water Resources Community Planning and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx Parks & Open Spaces shall provide to the Director, Water Resources Community Planning the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installed.
6.02 5.02 The installation of any storm sanitary sewer service connection from the storm sanitary sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 2 contracts
Samples: Development Agreement, Development Agreement
Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sewers and accessories, including but not limited to catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the ManagerDirector, Urban DevelopmentCalgary Approvals Coordination, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the ManagerDirector, Urban DevelopmentCalgary Approvals Coordination;
(3) all storm water reuse infrastructure including the reuse pumphouse, pump, and treatment, pipes and accessories conveying storm water from the storm pond to the Parks irrigation systems within the Development Area which may in the opinion of the Director, Calgary Approvals Coordination be required;
(4) all storm sewer service connections within the Development Area from the storm sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerDirector, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer connection is to be installed;
(45) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following:
(a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and;
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5c) all storm sewer service connections from the storm sewers to the property line of all commercial, multi multi-family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the ManagerDirector, Urban Development Calgary Approvals Coordination for the lane or road wherein the storm sewer service connections are to be installed.
6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Development Agreement
Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sewers and accessories, including but not limited to catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the Manager, Urban DevelopmentGrowth Management, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban DevelopmentGrowth Management;
(3) all storm sewer service connections within the Development Area from the storm sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development Growth Management for the lane or road within which the storm sewer connection is to be installed;
(4) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following:
(a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development Growth Management for the lane or road wherein the storm sewer service connections are to be installed.
6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Master Development Agreement
Installation. 6.01 The Developer, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) all storm sewers and accessories, including but not limited to catch basins and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination;
(3) all storm sewer service connections within the Development Area from the storm sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer connection is to be installed;
(4) a storm sewer service connection, extending from the storm sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sewer service connection to a School Site) within the Development Area subject to the following:
(a) the location and size of the storm sewer service connection to a Community Association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and;
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5c) all storm sewer service connections from the storm sewers to the property line of all commercial, multi multi-family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road wherein the storm sewer service connections are to be installed.
6.02 The installation of any storm sewer service connection from the storm sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Master Development Agreement
Installation. 6.01 5.01 The Developer, at its sole cost and expense, except as hereinafter providedotherwise provided in this Agreement, shall install and construct:
(1) all storm sanitary sewers complete with manholes and other accessories, including but not limited to catch basins pipes, fittings and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easementsgaskets, within the Development Area which may, in the opinion of the Manager, Urban DevelopmentGrowth Management, be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) all storm sanitary sewer service connections within the Development Area from the storm sanitary sewers to:
(a) three and one half (3.5) metres inside the property line of each lot; or
(b) where the storm sanitary sewer service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot where the requirements for the storm sanitary sewer service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development Growth Management for the lane or road within which the storm sanitary sewer connection is service connections are to be installed;; and
(43) a storm sanitary sewer service connection, extending connection from the storm sanitary sewer to the property line, to service a municipal reserve parcel (which shall not include a storm sanitary sewer service connection to a School Site) within the Development Area Area, subject to the following:
(a) the location and size of the storm sanitary sewer service connection to a Community Association community association building site will be subject to the approval of the Director, Water Resources and shall be shown on the approved Construction Drawings; and
(b) the Director, Xxxxx shall provide to the Director, Water Resources the sizing calculations as necessary; and
(5) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installed.
6.02 5.02 The installation of any storm sanitary sewer service connection from the storm sanitary sewer to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Master Development Agreement
Installation. 6.01 7.01 The DeveloperDeveloper shall, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) install all storm sewers water mains, valves, hydrants and accessoriesfittings, including but not limited pressure reducing valve xxxxxxxx and appurtenances that in the opinion of the Managing Director, Calgary Approvals Coordination, may be required to catch basins serve the Development Area and catch basin leads (where applicable)adjacent areas, whether or not the said water mains are in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the Manager, Urban Development, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) install all storm sewer water service connections within the Development Area from the storm sewers water mains to:
(a) three and one half (3.5) metres meters inside the property line of each lot; or
(b) where the storm sewer water service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot lot, where the requirements for the storm sewer water service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerManaging Director, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer water service connection is to be installed;
(4a) install a storm sewer single one hundred and fifty millimetre (150 mm) diameter water service connectionconnection and water meter box, extending which water meter box the City will install at no expense to the Developer, from the storm sewer water main to the property lineline of each and every:
(i) Sub-neighbourhood Park, to service a municipal Neighbourhood Park, Community Park, District Park and community association building site; and
(ii) excluding all School Sites and environmental reserve parcel (which shall not include a storm sewer service connection to a School Site) lands within the Development Area subject to the following:Area;
(ab) identify the location and size of the storm sewer water service connection to a the Community Association building site will site, which shall first be subject to approved by the approval Director of the Director, Water Resources and shall be shown on the approved Construction DrawingsDrawings and plans; and
(bc) the Director, Xxxxx shall provide to the Director, Water Resources with the sizing calculations as necessary; and
(54) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by for water mains and hydrants, disconnect any temporary water service connection(s) at the Managerwater main installed for any temporary irrigation system, Urban Development for all to the lane or road wherein satisfaction of the storm sewer service connections are to be installedManaging Director, Calgary Approvals Coordination.
6.02 7.02 The installation of any storm sewer water service connection from the storm sewer end of the water service connection to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Master Development Agreement
Installation. 6.01 7.01 The DeveloperDeveloper shall, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) install all storm sewers water mains, valves, hydrants and accessoriesfittings, including but not limited to catch basins pressure reducing valve xxxxxxxx and catch basin leads (where applicable), whether or not in Boundary Roads and Lanes and/or easements, within the Development Area which may, appurtenances that in the opinion of the Manager, Urban DevelopmentGrowth Management, may be required to adequately drain serve the Development Area and adjacent areas, including subsurface drainagewhether or not the said water mains are in boundary lanes, roads and/or easements;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) install all storm sewer water service connections within the Development Area from the storm sewers water mains to:
(a) three and one half (3.5) metres meters inside the property line of each lot; or
(b) where the storm sewer water service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.05. 0) metres inside the property line of each lot where the requirements for the storm sewer water service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the Manager, Urban Development Growth Management for the lane or road within which the storm sewer water service connection is to be installed;
(4a) install a storm sewer single one hundred and fifty millimetre (150 mm) diameter water service connectionconnection and water meter box, extending which water meter box the City will install at no expense to the Developer, from the storm sewer water main to the property lineline of each and every:
(i) Sub-neighbourhood Park, to service a municipal Neighbourhood Park, Community Park , District Park and community association building site; and
(ii) excluding all School Sites and environmental reserve parcel (which shall not include a storm sewer service connection to a School Site) lands within the Development Area subject to the following:Area;
(ab) identify the location and size of the storm sewer water service connection to a the Community Association building site will site, which shall first be subject to approved by the approval Director of the Director, Water Resources and shall be shown on the approved Construction DrawingsDrawings and plans; and
(bc) the Director, Xxxxx shall provide to the Director, Water Resources with the sizing calculations as necessary; and
(54) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by for water mains and hydrants, disconnect any temporary water service connection(s) at the water main installed for any temporary irrigation system, all to the satisfaction of the Manager, Urban Development for the lane or road wherein the storm sewer service connections are to be installedGrowth Management.
6.02 7.02 The installation of any storm sewer water service connection from the storm sewer end of the water service connection to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Master Development Agreement
Installation. 6.01 7.01 The DeveloperDeveloper shall, at its sole cost and expense, except as hereinafter provided, shall install and construct:
(1) install all storm sewers water mains, valves, hydrants and accessoriesfittings, including but not limited pressure reducing valve xxxxxxxx and appurtenances that in the opinion of the Director, Calgary Approvals Coordination, may be required to catch basins serve the Development Area and catch basin leads (where applicable)adjacent areas, whether or not the said water mains are in Boundary Roads and Lanes and/or easements, within the Development Area which may, in the opinion of the Manager, Urban Development, be required to adequately drain the Development Area and adjacent areas, including subsurface drainage;
(2) any inlet, storm detention facility or outfall structures with the necessary leads connected to the storm sewer to and from the Development Area as required by the Manager, Urban Development;
(3) install all storm sewer water service connections within the Development Area from the storm sewers water mains to:
(a) three and one half (3.5) metres meters inside the property line of each lot; or
(b) where the storm sewer water service connection crosses a gas line and another shallow utility located within a front yard easement, in which case the service connection shall be installed five (5.0) metres inside the property line of each lot lot, where the requirements for the storm sewer water service connections are known during the time prior to the acknowledgement of the last Final Acceptance Certificate by the ManagerDirector, Urban Development Calgary Approvals Coordination for the lane or road within which the storm sewer water service connection is to be installed;
(4a) install a storm sewer single one hundred and fifty millimetre (150 mm) diameter water service connectionconnection and water meter box, extending which water meter box the City will install at no expense to the Developer, from the storm sewer water main to the property lineline of each and every:
(i) Sub-neighbourhood Park, to service a municipal Neighbourhood Park, Community Park, District Park and community association building site; and
(ii) excluding all School Sites and environmental reserve parcel (which shall not include a storm sewer service connection to a School Site) lands within the Development Area subject to the following:Area;
(ab) identify the location and size of the storm sewer water service connection to a the Community Association building site will site, which shall first be subject to approved by the approval Director of the Director, Water Resources and shall be shown on the approved Construction DrawingsDrawings and plans; and
(bc) the Director, Xxxxx shall provide to the Director, Water Resources with the sizing calculations as necessary; and
(54) all storm sewer service connections from the storm sewers to the property line of all commercial, multi family and church sites within the Development Area, where the requirements for the storm sewer service connections are known, or become known during the time prior to the acknowledgement of the Final Acceptance Certificate by for water mains and hydrants, disconnect any temporary water service connection(s) at the Managerwater main installed for any temporary irrigation system, Urban Development for all to the lane or road wherein satisfaction of the storm sewer service connections are to be installedDirector, Calgary Approvals Coordination.
6.02 7.02 The installation of any storm sewer water service connection from the storm sewer end of the water service connection to any building on a lot within the Development Area shall be made under the supervision of a Qualified Plumber at no cost to the City.
Appears in 1 contract
Samples: Development Agreement