Insulated hot water storage tank Sample Clauses

Insulated hot water storage tank. The thickness of the water storage tank shall be uniform. Material: Insulated hot water storage tank shall be non-pressure type and made of stainless steel grade (X04Cr19Ni9 or X07Cr18Ni9 of IS: 1570(part 5) /1985), TIG welded. Insulation: Solar water heating system (SWHS) up to and including 500 LPD shall be insulated with 40mm thermal grade PUF insulation of 32 Kg/ meter cube or higher density. PUF insulation could be pre extruded type fitted with FRP exterior cladding or alternatively injection moulded in a twin walled steel tank and PPE end cap. Other systems shall be insulated with 100 mm thick Rock wool of 48Kg/m3 density with 22swg Aluminium cladding. Systems up to 500 LPD may also alternatively be installed with 100 mm thick Rock wool of same specifications with aluminium or GI powder coated cladding.
AutoNDA by SimpleDocs

Related to Insulated hot water storage tank

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Petroleum Storage Systems A. At Company’s expense, Company will at all times comply with all federal, state, and local requirements, including but not limited to, the regulations of the FDEP as stated in Chapters 62-761 and 62-762, FAC, the requirements of the Federal Oil Pollution Prevention regulation found in Title 40 of the Code of Federal Regulations Part 112 (40 CFR part 112), as well as the requirements of the Environmental Protection Commission of Hillsborough County (EPC), as may be amended or replaced, pertaining to petroleum storage tank and piping system construction, operation, inspection, and compliance monitoring programs; release detection methods and procedures; maintenance; and preventative maintenance programs. Company will be responsible for all spillage, overflow, or escape of gases, petroleum or petroleum products, and for all fines and penalties in connection therewith. All petroleum storage systems will be registered by Company, and Company will display the registration placard as required by law.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Environmental Tobacco Smoke Public Law 103-227 (also known as the Pro-Children Act of 1994) and Vermont’s Act 135 (2014) (An act relating to smoking in lodging establishments, hospitals, and child care facilities, and on State lands) restrict the use of tobacco products in certain settings. Party shall ensure that no person is permitted: (i) to use tobacco products or tobacco substitutes as defined in 7 V.S.A. § 1001 on the premises, both indoor and outdoor, of any licensed child care center or afterschool program at any time; (ii) to use tobacco products or tobacco substitutes on the premises, both indoor and in any outdoor area designated for child care, health or day care services, kindergarten, pre-kindergarten, elementary, or secondary education or library services; and (iii) to use tobacco products or tobacco substitutes on the premises of a licensed or registered family child care home while children are present and in care. Party will refrain from promoting the use of tobacco products for all clients and from making tobacco products available to minors. Failure to comply with the provisions of the federal law may result in the imposition of a civil monetary penalty of up to $1,000 for each violation and/or the imposition of an administrative compliance order on the responsible entity. The federal Pro-Children Act of 1994, however, does not apply to portions of facilities used for inpatient drug or alcohol treatment; service providers whose sole source of applicable federal funds is Medicare or Medicaid; or facilities where Women, Infants, & Children (WIC) coupons are redeemed.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

Time is Money Join Law Insider Premium to draft better contracts faster.