Inter-High Rock Band Sample Clauses

Inter-High Rock Band. The conductor of the Inter-High Rock Band shall receive $1215 to include rehearsals, necessary clerical work and travel time required.
AutoNDA by SimpleDocs

Related to Inter-High Rock Band

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • SUB-CONTRACTING 31.1. The Authority approves the appointment of the sub-contractors specified in Schedule 10 (Approved Sub-contractors) in respect of the obligations specified in that Schedule. 31.2. The Contractor may not sub-contract its obligations under the Framework Agreement to other sub-contractors without the prior written consent of the Authority. Sub-contracting of any part of the Framework Agreement shall not relieve the Contractor of any obligation or duty attributable to the Contractor under the Framework Agreement. The Contractor shall be responsible for the acts and omissions of its sub-contractors as though they are its own. 31.3. Where the Contractor enters into a sub-contract the Contractor must ensure that a provision is included which: 31.3.1. requires payment to be made of all sums due by the Contractor to the sub- contractor within a specified period not exceeding 30 days from the receipt of a valid invoice as defined by the sub-contract requirements and provides that, where the Authority has made payment to the Contractor in respect of Services and the sub-contractor’s invoice relates to such Services then, to that extent, the invoice must be treated as valid and, provided the Contractor is not exercising a right of retention or set-off in respect of a breach of contract by the sub-contractor or in respect of a sum otherwise due by the sub-contractor to the Contractor, payment must be made to the sub-contractor without deduction; 31.3.2. notifies the sub-contractor that the sub-contract forms part of a larger contract for the benefit of the Authority and that should the sub-contractor have any difficulty in securing the timely payment of an invoice, that matter may be referred by the sub- contractor to the Authority; 31.3.3. requires that all contracts with subcontractors and suppliers which the subcontractor intends to procure, and which the subcontractor has not before the date of this Framework Agreement, already planned to award to a particular supplier are advertised through the Public Contracts Scotland procurement portal (xxx.xxxxxxxxxxxxxxxxxxxxxxx.xxx.xx) and awarded following a fair, open, transparent and competitive process proportionate to the nature and value of the contract; and 31.3.4. is in the same terms as that set out in this clause 31.3 (including for the avoidance of doubt this clause 31.3.4) subject only to modification to refer to the correct designation of the equivalent party as the Contractor and sub-contractor as the case may be. 31.4. The Contractor shall include in every sub-contract: 31.4.1 a right for the Contractor to terminate that sub-contract if the relevant sub- contractor fails to comply in the performance of its contract with legal obligations in the fields of environmental, social or employment law or if any of the termination events (involving substantial modification of the Contract, contract award despite the existence of exclusion grounds or a serious infringement of EU legal obligations) specified in clause 42.4 occur; and 31.4.2 a requirement that the sub-contractor includes a provision having the same effect as 31.4.1 in any sub-contract which it awards. In this Clause 31.4, ‘sub-contract’ means any contract between two or more contractors, at any stage of remoteness from the Authority in a sub-contracting chain, made wholly or substantially for the purpose of performing (or contributing to the performanace of) the whole or any part of this Framework Agreement. 31.5. Where requested by the Authority, copies of any sub-contract must be sent by the Contractor to the Authority as soon as reasonably practicable. 31.6. Where the Contractor proposes to enter into a sub-contract it must: 31.6.1 advertise its intention to do so in at least one trade journal, and the Public Contracts Scotland Portal; and 31.6.2 follow a procedure leading to the selection of the sub-contractor which ensures reasonable competition following principles of equal treatment, non-discrimination and transparency and which ensures that such procedure is accessible by small and medium enterprises.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.

  • NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

  • Availability of Verizon Telecommunications Services 3.1 Verizon will provide a Verizon Telecommunications Service to Z-Tel for resale pursuant to this Attachment where and to the same extent, but only where and to the same extent, that such Verizon Telecommunications Service is provided to Verizon’s Customers. 3.2 Except as otherwise required by Applicable Law, subject to Section 3.1, Verizon shall have the right to add, modify, grandfather, discontinue or withdraw, Verizon Telecommunications Services at any time, without the consent of Z-Tel. 3.3 To the extent required by Applicable Law, the Verizon Telecommunications Services to be provided to Z-Tel for resale pursuant to this Attachment will include a Verizon Telecommunications Service customer-specific contract service arrangement (“CSA”) (such as a customer specific pricing arrangement or individual case based pricing arrangement) that Verizon is providing to a Verizon Customer at the time the CSA is requested by Z-Tel.

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!