Interconnection Energization Sample Clauses

Interconnection Energization. The Owners shall energize, or cause to be energized, the Interconnection upon successful completion of acceptance testing of the Interconnection by the Operator, including installation of the Metering Equipment specified in Section 10.04, and completion of the operating procedures specified in Section 10.02. The Parties recognize the need for the approval of an expedited WECC ratings review for Path 14 (Idaho to Northwest ) and Path 75 (Midpoint-Summer Lake) both of which are affected by the Hxxxxxxxx Substation Interconnection. Idaho Power agrees to intertie the planned Hxxxxxxxx Substation 230 kV transmission line to the Idaho Power 138 kV Treasure Valley system only after the WECC ratings process is complete The non-simultaneous and simultaneous export ratings of the Midpoint-Summer Lake 500 kV line are presently 1500 MW and 1187 MW respectively. Idaho Power acknowledges the desire to maintain the non-simultaneous export rating of the Midpoint-Summer Lake Line and will mitigate any adverse impacts that the Hxxxxxxxx Substation causes to the non-simultaneous export rating of the Midpoint-Summer Lake Line which is identified in the WECC rating process in connection with the initial energization of the Hxxxxxxxx Substation. Such mitigation shall include changes to operating procedures if necessary to achieve this desired rating. The simultaneous export rating of the Midpoint-Summer Lake Line is an allocation of the capability of multiple lines in Path 14, and Idaho Power will support PacifiCorp if a third party raises a challenge to the simultaneous rating of the Midpoint-Summer Lake Line.
AutoNDA by SimpleDocs
Interconnection Energization. The Owners shall energize, or cause to be energized, the Interconnection upon successful completion of acceptance testing of the Interconnection by the Operator, including installation of the Metering Equipment specified in Section 10.04, and completion of the operating procedures specified in Section 10.02.

Related to Interconnection Energization

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Electric N/A Electric from Clark from PP6 to DCU-843 2 N/A ------------------------------------------------------------------------------------------------------------------ N/A Electric from Clark from PP6 to Feed Tanks 4 N/A ------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------

  • GOVERNMENT ENERGY OR UTILITY CONTROLS In the event of imposition of federal, state or local government controls, rules, regulations, or restrictions on the use or consumption of energy or other utilities during the Term, both Landlord and Tenant shall be bound thereby. In the event of a difference in interpretation by Landlord and Tenant of any such controls, the interpretation of Landlord shall prevail, and Landlord shall have the right to enforce compliance therewith, including the right of entry into the Premises to effect compliance.

  • HORIZONR Gateway HORIZONR Gateway provides customers with the ability to (i) generate reports using information maintained on the Multicurrency HORIZONR Accounting System which may be viewed or printed at the customer’s location; (ii) extract and download data from the Multicurrency HORIZONR Accounting System; and (iii) access previous day and historical data. The following information which may be accessed for these purposes: 1) holdings; 2) holdings pricing; 3) transactions, 4) open trades; 5) income; 6) general ledger and 7) cash.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • PFPC System PFPC shall retain title to and ownership of any and all data bases, computer programs, screen formats, report formats, interactive design techniques, derivative works, inventions, discoveries, patentable or copyrightable matters, concepts, expertise, patents, copyrights, trade secrets, and other related legal rights utilized by PFPC in connection with the services provided by PFPC to the Fund.

  • Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.

Time is Money Join Law Insider Premium to draft better contracts faster.