ITAR Overview Sample Clauses

ITAR Overview. The ITAR identifies the articles subject to regulation (i.e. Defense Articles) on the United States Munitions List (“USML”). The USML is comprised of 21 categories of articles. (22 C.F.R. 1.) The ITAR defines “Technical Data” broadly to include “[i]nformation… required for the design, development, production, manufacture, assembly, operation, repair, testing, maintenance, or modification of defense articles.” (22 C.F.R. §121.
AutoNDA by SimpleDocs

Related to ITAR Overview

  • Program Overview Microsoft extends to eligible partners the opportunity to participate in the Program referenced above subject to these Program Terms & Conditions (“Program Terms”). Each entity participating in the Program is hereinafter referred to as a “Participant.” Participation in the Program is voluntary. The Program is governed by the Program Terms, which incorporate by reference the Microsoft Partner Network Agreement (as in effect between Microsoft and Participant, the “MPN Agreement”). Capitalized terms used but not defined in these Program Terms have the meanings assigned to them in the MPN Agreement. These Program Terms are subject to local requirements and may vary by jurisdiction, and Participant retains sole discretion to set pricing for sales of applicable products.

  • Project Overview Project Title [Drafting note: ARENA to complete. Insert full long name in accordance with ARENA’s naming convention] i.e. [GMS Number] [Powerworks, voltage control on the Pacific Islands Study] [GMS Number] [study/ project/ fellowship/ scholarship/ R&D Project] Contract Number [Drafting note: ARENA to complete – to be obtained from ARENA’s GMS] Recipient [Drafting note: Recipient to insert full legal name and ABN] Guidelines and policies Advancing Renewables Program – Program Guidelines, 2020 (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/XXXXX_XXX_Xxxxxxxxxx_XX_Xxxxxx_Xxxxx_XXXXX.xxx) ARENA Variation Policy (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxxx-xxxxxxxxx-xxxxxxxxx-xxxxxx.xxx) ARENA Report Writing Guidelines (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxx-xxxxxxx-xxxxxxxxxx.xxx)

  • Agreement Overview This SLA operates in conjunction with, and does not supersede or replace any part of, the Agreement. It outlines the information technology service levels that we will provide to you to ensure the availability of the application services that you have requested us to provide. All other support services are documented in the Support Call Process.

  • Overview (a) The Employer is committed to maintaining a stable and skilled workforce, recognising its contribution to the operation of the Employer. As such, full time direct and ongoing employment is a guiding principle of this Agreement. (b) The Employer will take all measures to achieve employment security for the direct permanent employees of the Employer. The Parties agree upon the measures in this Clause to protect and enhance the employment security, health and safety, terms and conditions of employment and career development of the employees. (c) The employer agrees that it is highly important to ensure that work is performed effectively, efficiently and without undue pressure or bullying, and in a way that promotes OHS and EO principles and practices in the workplace and appropriate representation of employees should they so request. The employer will ensure that its employment practices are consistent with the above principles and practices.

  • Service Overview Contractor agrees to provide to the California Department of Health Care Services (DHCS) the services described herein.

  • Authorization, Approval, etc No authorization, approval, or other action by, and no notice to or filing with, any governmental authority, regulatory body or any other Person is required either (a) for the pledge by the Pledgor of any Collateral pursuant to this Pledge Agreement or for the execution, delivery, and performance of this Pledge Agreement by the Pledgor, or (b) for the exercise by the Collateral Agent of the voting or other rights provided for in this Pledge Agreement, or, except with respect to any Pledged Shares, as may be required in connection with a disposition of such Pledged Shares by laws affecting the offering and sale of securities generally, the remedies in respect of the Collateral pursuant to this Pledge Agreement.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • NATIONAL JOINT COUNCIL AGREEMENTS 22.1 Subject to the National Joint Council By-Laws, agreements concluded by the National Joint Council of the Public Service on items which may be included in a collective agreement, and which the parties to this agreement have endorsed after December 6, 1978, will form part of this collective agreement, subject to the Federal Public Sector Labour Relations Act (FPSLRA) and any legislation by Parliament that has been or may be, as the case may be, established pursuant to any Act prescribed in Section 113(b) of the PSLRA. 22.2 NJC items which may be included in a collective agreement are those items which the parties to the NJC agreements have designated as such or upon which the Chairman of the Federal Public Sector Labour Relations Board has made a ruling pursuant to (c) of the NJC Memorandum of Understanding which became effective December 6, 1978 22.3 The following directives, as amended from time to time by National Joint Council recommendation and which have been approved by the National Research Council Canada, form part of this Agreement: - Bilingualism Bonus Directive - Commuting Assistance Directive - Occupational Health and Safety Directive - Relocation Directive - Travel Directive - First Aid to the General Public – Allowances for Employees - Public Service Health Care Plan - Uniforms Directive 22.4 During the term of this Agreement, other directives may be added to the above noted list. 22.5 Grievances in regard to the above directives shall be presented in accordance with clause 19.1 of the Grievance Procedure article of this Agreement.

  • CERTIFICATION REGARDING CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree to the following required by Texas law as of September 1, 2021: Proposing Company is prohibited from entering into a contract or other agreement relating to critical infrastructure that would grant to the company direct or remote access to or control of critical infrastructure in this state, excluding access specifically allowed by the Proposing Company for product warranty and support purposes. Company, certifies that neither it nor its parent company nor any affiliate of company or its parent company, is (1) owned by or the majority of stock or other ownership interest of the company is held or controlled by individuals who are citizens of China, Iran, North Korea, Russia, or a designated country; (2) a company or other entity, including governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (3) headquartered in China, Iran, North Korea, Russia, or a designated country. For purposes of this contract, “critical infrastructure” means “a communication infrastructure system, cybersecurity system, electric grid, hazardous waste treatment system, or water treatment facility.” See Tex. Gov’t Code § 2274.0101(2) of SB 1226 (87th leg.). The company verifies and certifies that company will not grant direct or remote access to or control of critical infrastructure, except for product warranty and support purposes, to prohibited individuals, companies, or entities, including governmental entities, owned, controlled, or headquartered in China, Iran, North Korea, Russia, or a designated country, as determined by the Governor.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.