LABOR, MATERIALS AND EQUIPMENT. 6.4.1 The Contractor shall provide competent, qualified personnel to lay out its Work from base lines and bench marks established and to perform construction as required by the Contract Documents. It shall at all times maintain good discipline and order at the site. 6.4.2 Contractor shall furnish all material, equipment, transportation, labor, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water and sanitary facilities and all other facilities and incidentals necessary for the execution, testing, initial operation and completion of the Work, unless otherwise provided in the Contract Documents. 6.4.3 All materials and equipment incorporated into the Project shall be new except as otherwise provided in the Contract Documents. If required by County, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 6.4.4 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturer, fabricator, supplier or distributor, except as otherwise provided in the Contract Documents. 6.4.5 The Contractor shall be responsible for providing a complete and operable installation of all equipment it furnishes. Any changes or Modifications required to the Contract Documents as a result of the equipment manufacturer’s requirements, and all adjustments to all other Work affected thereby, including but not limited to, added engineering costs due to redesign (to be paid to a design professional), structural, mechanical, electrical, heating, ventilation and air conditioning changes shall be borne by the Contractor at no additional cost to the County.
Appears in 5 contracts
Samples: Construction Contract, Construction Contract, Construction Contract