Field Conditions. Prior to the commencement of its construction, Tenant shall survey the site to inspect, verify and coordinate all existing conditions within the Leased Premises. Such survey shall include the location of existing mall utilities which are to remain, placement of wall stud framing defining the Leased Premises, and identification of various improvements made by previous occupant(s), if any, which are to remain, be relocated or removed and the determination of the extent of demolition or repair to be performed by Tenant. Tenant shall advise Landlord immediately of any discrepancies with respect to Xxxxxxxx’s Space Layout drawings. Any resultant revisions from such survey shall be incorporated into Tenant’s Working Drawings and Specifications. Tenant shall verify conditions pertaining to the Leased Premises from time to time after commencement of construction of its Leased Premises. Any adjustments to the work arising from field conditions not apparent on drawings and other building documents shall receive the prior written approval of Landlord. Immediately following the installation by Landlord of wall stud framing defining the Leased Premises, Tenant shall verify the accuracy of said installation and shall immediately advise Landlord of any discrepancies. Failure to so notify Landlord shall be deemed as acceptance by Xxxxxx of said installation and layout. Tenant shall coordinate its work with the work of others or with existing conditions occurring above or below the Leased Premises and shall make changes from time to time as required to accommodate such work or conditions.
Field Conditions. From time to time, the Tenant is obligated to verify conditions pertaining to the Leased Premises prior to and after commencement of construction of its Leased Premises. Tenant shall coordinate its work with the work of Landlord, other tenants, and with existing conditions above, below and adjacent to the Leased Premises. Tenant shall make changes as required to accommodate such work or conditions.
Field Conditions. Subject to Section 16.1 and Section 16.2, Licensee and Licensor shall cooperate with respect to scheduling and maintenance to provide a suitable field condition and appearance for Priority Events and for UNLV Team Home Games. No UNLV Team Home Game or Other UNLV Event shall be scheduled or, subject to Section 37.1, shall continue to occur, during the twelve (12)-hour period prior to an NFL Event.
Field Conditions. A. Cold-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 306.1 and as follows.
1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2. When average high and low temperature is expected to fall below 40 deg F (4.4 deg C) for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301 (ACI 301M).
3. Do not use frozen materials or materials containing ice or snow.
4. Do not place concrete in contact with surfaces less than 35 deg F (1.7 deg C), other than reinforcing steel.
5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M), and as follows:
1. Maintain concrete temperature at time of discharge to not exceed 95 deg F (35 deg C).
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
Field Conditions. Environmental Limitations: Rate equipment for continuous operation under the following conditions unless otherwise indicated:
Field Conditions. Tenant shall verify all field conditions and dimensions prior to the commencement of construction.
Field Conditions. A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
Field Conditions. The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor, or information which a Contractor of ordinary skill and expertise for the type of Work involved would have known, before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the Owner and A/E at once. If the Contractor performs any construction activity without such notice to the Owner and A/E and prior to the resolution of the error, inconsistency or omission, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.
Field Conditions. Check and verify Contract Documents and field conditions before proceeding with Work. If there are any questions regarding these or other coordination questions, the Contractor is responsible for obtaining clarification from the A/E before proceeding with Work or related Work in question.
Field Conditions. A. Environmental Limitations: Comply with MVE-control system manufacturer's written instructions for substrate and ambient temperatures, humidity, ventilation, and other conditions affecting system installation.
1. Store system components in a temperature-controlled environment and protected from weather and at ambient temperature of not less than 65 deg F and not more than 85 deg F at least 48 hours before use.
2. Maintain ambient temperature and relative humidity in installation areas within range recommended in writing by MVE-control system manufacturer, but not less than 65 deg F or more than 85 deg F and not less than 40 or more than 60 percent relative humidity, for 48 hours before installation, during installation, and for 48 hours after installation unless longer period is recommended in writing by manufacturer.
3. Install MVE-control systems where concrete surface temperatures will remain a minimum of 5 deg F higher than the dew point for ambient temperature and relative humidity conditions in installation areas for 48 hours before installation, during installation, and for 48 hours after installation unless longer period is recommended in writing by manufacturer.