Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.
PARKING PERMITS A. Must be obtained on the day of move in. B. Towing charges resulting from violations will be the responsibility of the RESIDENT. C. Any form of duplication of parking permits is a violation of the LEASE AGREEMENT, and may be grounds for eviction. Note: Refer to Resident Handbook for further detail.
Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.
Building Permit The Owner shall pay for all permits. The Owner and AE shall be required to provide such information to the Permitting Authority as is necessary to obtain approval from the Permitting Authority to commence construction prior to beginning construction. The CM shall pull the Building Permit, and shall be responsible for delivering and posting the Building Permit at the Project Site prior to the commencement of construction. The Owner and AE shall fully cooperate with the CM when and where necessary.
Existence; Compliance with Laws; Businesses and Properties (a) Do or cause to be done all things necessary to preserve, renew and keep in full force and effect its legal existence, except as otherwise expressly permitted under Section 6.05. (i) Do or cause to be done all things necessary to obtain, preserve, renew, extend and keep in full force and effect the rights, licenses, permits, franchises and authorizations, material to the conduct of its business, except as could not reasonably be expected to have a Material Adverse Effect; (ii) comply in all material respects with all applicable laws, rules, regulations and decrees and orders of any Governmental Authority, whether now in effect or hereafter enacted, except as could not reasonably be expected to have a Material Adverse Effect; and (iii) at all times maintain and preserve all tangible property material to the conduct of such business and keep such property in good repair, working order and condition (subject to ordinary wear and tear, casualty and condemnation) and from time to time make, or cause to be made, all needful and proper repairs, renewals, additions, improvements and replacements thereto necessary in order that the business carried on in connection therewith may be properly conducted at all times, except as could not reasonably be expected to have a Material Adverse Effect.
Compliance with Environmental Laws; Environmental Reports (a) Comply and use commercially reasonable efforts to cause all lessees and other persons occupying Real Property owned or operated by any Company to comply, in all material respects with all Environmental Laws and Environmental Permits applicable to its operations and property and obtain and renew all material Environmental Permits applicable to its operations and property and conduct any Response in accordance with Environmental Laws; provided, however, that no Company shall be required to undertake any Response to the extent that its obligation to do so is being contested in good faith and by proper proceedings and appropriate reserves are being maintained with respect to such circumstances in accordance with GAAP. (b) If a Default caused by reason of a breach of Section 3.17 or Section 5.09(a) shall have occurred and be continuing for more than 20 Business Days without the Companies commencing activities reasonably likely to cure such Default, at the written request of the Required Lenders through the Administrative Agent, provide to the Lenders within 45 days after such request, at the expense of Borrower, an environmental site assessment report regarding the matters which are the subject of such default, including where appropriate, any soil and/or groundwater sampling, prepared by an environmental consulting firm and in form and substance reasonably acceptable to the Administrative Agent and indicating the presence or absence of Hazardous Materials and the estimated cost of any compliance or Response to address them in connection with such Default.
Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.
Compliance with Environmental Laws Except as otherwise described in the Prospectus, and except as would not, individually or in the aggregate, result in a Material Adverse Change (i) neither the Company nor any of its subsidiaries is in violation of any federal, state, local or foreign law or regulation relating to pollution or protection of human health or the environment (including, without limitation, ambient air, surface water, groundwater, land surface or subsurface strata) or wildlife, including without limitation, laws and regulations relating to emissions, discharges, releases or threatened releases of chemicals, pollutants, contaminants, wastes, toxic substances, hazardous substances, petroleum and petroleum products (collectively, “Materials of Environmental Concern”), or otherwise relating to the manufacture, processing, distribution, use, treatment, storage, disposal, transport or handling of Materials of Environmental Concern (collectively, “Environmental Laws”), which violation includes, but is not limited to, noncompliance with any permits or other governmental authorizations required for the operation of the business of the Company or its subsidiaries under applicable Environmental Laws, or noncompliance with the terms and conditions thereof, nor has the Company or any of its subsidiaries received any written communication, whether from a governmental authority, citizens group, employee or otherwise, that alleges that the Company or any of its subsidiaries is in violation of any Environmental Law; (ii) there is no claim, action or cause of action filed with a court or governmental authority, no investigation with respect to which the Company has received written notice, and no written notice by any person or entity alleging potential liability for investigatory costs, cleanup costs, governmental responses costs, natural resources damages, property damages, personal injuries, attorneys’ fees or penalties arising out of, based on or resulting from the presence, or release into the environment, of any Material of Environmental Concern at any location owned, leased or operated by the Company or any of its subsidiaries, now or in the past (collectively, “Environmental Claims”), pending or, to the Company’s knowledge, threatened against the Company or any of its subsidiaries or any person or entity whose liability for any Environmental Claim the Company or any of its subsidiaries has retained or assumed either contractually or by operation of law; and (iii) to the best of the Company’s knowledge, there are no past or present actions, activities, circumstances, conditions, events or incidents, including, without limitation, the release, emission, discharge, presence or disposal of any Material of Environmental Concern, that reasonably could result in a violation of any Environmental Law or form the basis of a potential Environmental Claim against the Company or any of its subsidiaries or against any person or entity whose liability for any Environmental Claim the Company or any of its subsidiaries has retained or assumed either contractually or by operation of law.
Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location that could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law;
Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.