Level C – Resource Recovery Driver Sample Clauses

Level C – Resource Recovery Driver. Multi-Qualified The Resource Recovery Driver - Multi-Qualified wage shall be paid to a driver, assessed as competent by a nominated ICC Trainer and/or Assessor at the rate indicated in Table 1. This wage shall be maintained until possible progression to Level D Resource Recovery Driver – Senior. To be classed as a Resource Recovery Driver - Multi-Qualified, the individual must be competent as described above in at least two (2) specific waste vehicle driving disciplines, of either Side Arm, Front Lift, Rear Lift, Roll On Roll Off or Skip, and must have been successfully deemed competent by an ICC Trainer and/or Assessor, across each discipline, and approved for progression as per current delegation of authority. Alternatively, Resource Recovery Drivers – Qualified, that have maintained employment for five (5) or more consecutive years but are only qualified in one vehicle type may also be graded as Resource Recovery Driver – Multi- Qualified, assuming they meet the remaining criteria of safety performance and approved for progression as per current delegation of authority. Drivers deemed as Multi-Qualified will also:
AutoNDA by SimpleDocs

Related to Level C – Resource Recovery Driver

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Disaster Recovery Plan Contractor agrees that upon request of System Agency, Contractor shall provide copies of its most recent business continuity and disaster recovery plans.

  • Disaster Recovery PFPC shall enter into and shall maintain in effect with appropriate parties one or more agreements making reasonable provisions for emergency use of electronic data processing equipment to the extent appropriate equipment is available. In the event of equipment failures, PFPC shall, at no additional expense to the Fund, take reasonable steps to minimize service interruptions. PFPC shall have no liability with respect to the loss of data or service interruptions caused by equipment failure, provided such loss or interruption is not caused by PFPC's own willful misfeasance, bad faith, gross negligence or reckless disregard of its duties or obligations under this Agreement.

  • Network Resource Interconnection Service (check if selected)

  • DISASTER RECOVERY AND BUSINESS CONTINUITY The Parties shall comply with the provisions of Schedule 5 (Disaster Recovery and Business Continuity).

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • Unbundled Subloop Distribution (USLD) 2.8.2.1 The USLD facility is a dedicated transmission facility that BellSouth provides from an End User’s point of demarcation to a BellSouth cross-connect device. The BellSouth cross-connect device may be located within a remote terminal (RT) or a stand-alone cross-box in the field or in the equipment room of a building. The USLD media is a copper twisted pair that can be provisioned as a 2-wire or 4-wire facility. BellSouth will make available the following subloop distribution offerings where facilities exist: USLD – Voice Grade (USLD-VG) Unbundled Copper Subloop (UCSL) USLD – Intrabuilding Network Cable (USLD-INC (aka riser cable))

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.