Litter Receptacles Sample Clauses

Litter Receptacles. At a minimum, North10 shall install or cause to be installed at least one covered litter receptacle within 10 feet of each public entrance to the Project, and at least one covered litter receptacle on any face of the Project lacking an entrance. North10 shall maintain and empty the litter receptacles as necessary to ensure that they remain safe and usable for both pedestrians and Project invitees.
AutoNDA by SimpleDocs
Litter Receptacles. (a) CapMetro is seeking to purchase fabricated steel littler receptacles/containers with a 32 Gal. Black Round Liner. The liner shall be made of a durable design, dent resistant, environmentally friendly, and made of recycled content or an approved equivalent to match the TR-12 Great Street receptacle as supplied by Tour- nesol or an approved equivalent. (b) Existing litter receptacles shall be manufactured in accordance with the design drawings and specifications provided under Exhibit F-3. (c) The successful Contractor’s final interpretation of drawings, and/or field verification must be completed, ap- proved, and documented in writing with CapMetro’s Project Manager and the Procurement Department be- fore fabrication of the of litter receptacles/containers can commence. (d) All welds between flat straps shall be smooth continuous fillet welds ground smooth where necessary, to remove any burs or sharp edges. Where flared straps meet ½” rod, all welds are ground smooth for appear- ance. (e) Following fabrication, the receptacles shall be cleaned and treated with an iron phosphate process prior to the coating application. This process shall include a non-chromated alkaline cleaner and an iron phosphate treatment followed with an acidic sealer for maximum adhesion. The protective coating shall consist of a corrosion resistant epoxy undercoat with a RAL9006 color coat, Tournesol Silver Matte (approved equal), or an approved equivalent and a clear topcoat . Color coat and clearcoat are polyester TGIC power applied by the dry electrostatic method. The resultant coating shall be a minimum of 4 mils thick on all surfaces. There is no lead in the finish. (f) The Contractor shall build, finish (apply coatings), and deliver the litter receptacles/containers units and liner units to CapMetro.
Litter Receptacles. The Contractor has proposed Litter Receptacles for each new Transit Shelter; however, the City reserves the right to approve a Transit Shelter without a Litter Receptacle.

Related to Litter Receptacles

  • Containers The marine and intermodal cargo containers either owned or leased by the Borrower and employed by the Borrower in the conduct of its business, including, without limitation, refrigerated, dry van, tank, open top and flat rack containers and refrigeration units and generator sets associated therewith, but excluding any chassis for such containers.

  • Preservative-treated Wood Containing Arsenic Grantee may not purchase preservative-treated wood products containing arsenic in the performance of this Agreement unless an exemption from the requirements of Chapter 13 of the San Francisco Environment Code is obtained from the Department of the Environment under Section 1304 of the Code. The term “preservative-treated wood containing arsenic” shall mean wood treated with a preservative that contains arsenic, elemental arsenic, or an arsenic copper combination, including, but not limited to, chromated copper arsenate preservative, ammoniacal copper zinc arsenate preservative, or ammoniacal copper arsenate preservative. Grantee may purchase preservative-treated wood products on the list of environmentally preferable alternatives prepared and adopted by the Department of the Environment. This provision does not preclude Grantee from purchasing preservative-treated wood containing arsenic for saltwater immersion. The term “saltwater immersion” shall mean a pressure-treated wood that is used for construction purposes or facilities that are partially or totally immersed in saltwater.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • KITCHEN Black Granite counter top, Stainless steel sink (17'' x 20''), glazed wall tiles up to 2 ft above black granite counter.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Alcoholic Beverages Costs of alcoholic beverages are unallowable.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!