Local Breaker Back up Protection Sample Clauses

Local Breaker Back up Protection. This shall be provided for each 765 kV and 400 kV circuit breakers and will be connected to de- energize the affected stuck breaker from both sides. 1. LBB and REF relays shall be provided separately from the transformer differential relay. 2. LBB relay may also be provided as a built-in protection function of distributed bus bar protection scheme; however in such case separate LBB relay shall be provided for tie bays (in case of One and Half breaker scheme).
AutoNDA by SimpleDocs
Local Breaker Back up Protection. This shall be provided for each 765kV, 400kV and 220kV circuit breakers and will be connected to de-energize the affected stuck breaker from both sides. Notes: 1. LBB & REF relays shall be provided separately from transformer differential relay. 2. LBB relay may also be provided as built-in protection function of distributed bus bar protection scheme; however in such case separate LBB relay shall be provided for tie bays (in case of One and Half breaker scheme). 3. Over fluxing & overload protection can be provided as built-in feature of differential relay. 4. In 765kV & 400kV switchyard, if spare bay of half diameter is identified as future, Tie CB relay panel shall be provided with Auto-reclosure feature.
Local Breaker Back up Protection. This shall be provided for each 400kVand 220kV circuit breakers and will be connected tode-energize the affected stuck breaker from both sides.
Local Breaker Back up Protection. This shall be provided for each 400kV circuit breakers and will be connected to de-energize the affected stuck breaker from both sides. 1. LBB & REF relays shall be provided separately from transformer differential relay. 2. LBB relay may also be provided as built-in protection function of distributed bus bar protection scheme; however, in such case separate LBB relay shall be provided for tie bays (in case of One and Half breaker scheme). 3. Over fluxing & overload protection can be provided as built-in feature of differential relay. 4. In 400kV switchyard, if spare bay of half diameter is identified as future, Tie CB relaypanel shall be with Auto-reclosure feature.

Related to Local Breaker Back up Protection

  • Whistle Blowing Protection The Employer agrees to adhere to the whistle blowing protection pursuant to the

  • – DISABILITY INCOME PROTECTION PLAN i) The Disability Income Protection Plan of the designated employer will be in accordance with the collective agreement. ii) There will be no break in coverage and/or waiting period prior to being able to receive the Disability Income Protection Plan so long as the waiting period has already been served.

  • System Protection To prevent compromise of systems which contain DSHS Data or through which that Data passes: a. Systems containing DSHS Data must have all security patches or hotfixes applied within 3 months of being made available. b. The Contractor will have a method of ensuring that the requisite patches and hotfixes have been applied within the required timeframes. c. Systems containing DSHS Data shall have an Anti-Malware application, if available, installed. d. Anti-Malware software shall be kept up to date. The product, its anti-virus engine, and any malware database the system uses, will be no more than one update behind current.