Main Engine Model Sample Clauses

Main Engine Model. The specifications of the main engine installation on-board the Stena Carrier is given in Table 56, see Deliverable D2.1 for further details. Main Data for Engine Type 8ZA40s Number of cylinders 8 Cycle 4 stroke Cylinder bore 400 mm Stroke 560 mm Engine speed 510 rpm Engine output 5760 kW BMEP 24.1 bar Mean piston speed 9.5 m/s Max. combustion pressure 168 bar BSFC range 176-185 g/kWh Length 8677 mm Mass 78 tonnes Table 56: Stena Carrier’s main engine specifications A standard 4-stroke engine model was adapted to represent the specifications of the installed engine. In addition, the engine model was combined with the WHRS connection model discussed in chapter 3.4.1.3 and shown in Figure 89. Figure 88: Main reference Diesel engine system Table 57 gives the input and output parameters needed to define the main engine GES model. Type Name Gates Paramet ers 8ZA40s #1 11 9 Version INOMAN.1 Help Electric Created Fuel type 1 TNO SWBS 2331 5/12/2013 gate # Index Power [In,Out] effort cal unit flow cal unit parameter # name value unit 0 0 Out M [N.m] w func [rad/s] 0 variable speed 50 [rad/s]
AutoNDA by SimpleDocs

Related to Main Engine Model

  • Model List your model number of the product you are bidding.

  • Engine A. Any internal repairs or replacement of internal components, or replacement of engine assembly.

  • REVERSE ENGINEERING & SECURITY You agree not to undertake any of the following actions:

  • Catalog Information about Community Regional Medical Center – Diagnostic Medical Sonography Program (CRMC-DMSP) is published in a school catalog that contains a description of certain policies, procedures, and other information about the school. CRMC-DMSP reserves the right to change any provision of the catalog at any time. Notice of changes will be communicated in a revised catalog, an addendum or supplement to the catalog, or other written format. Students are expected to read and be familiar with the information contained in the school catalog, in any revisions, supplements and addenda to the catalog, and with all school policies. By enrolling in CRMC-DMSP, the Student agrees to abide by the terms stated in the catalog and all school policies.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • SPECIAL TOOLS & TEST EQUIPMENT If the price stated on the Offer includes the cost of any special tooling or special test equipment fabricated or required by the Contractor for the purpose of filling this order, such special tooling equipment and any process sheets related thereto shall become the property of the City and shall be identified by the Contractor as such.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Reporting Model 1 FFI The term Reporting Model 1 FFI means a Financial Institution with respect to which a non-U.S. government or agency thereof agrees to obtain and exchange information pursuant to a Model 1 IGA, other than a Financial Institution treated as a Nonparticipating Financial Institution under the Model 1 IGA. For purposes of this definition, the term Model 1 IGA means an arrangement between the United States or the Treasury Department and a non-U.S. government or one or more agencies thereof to implement FATCA through reporting by Financial Institutions to such non-U.S. government or agency thereof, followed by automatic exchange of such reported information with the IRS.

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • Financial Model 37.1 Unless otherwise agreed between the parties, any amendments to the Financial Model shall reflect, be consistent with and be made only in accordance with the provisions of this Agreement, and shall in all cases be subject to the prior written approval of the Authority (such approval not to be unreasonably withheld or delayed). In the event that the parties fail to agree any proposed amendments to the Financial Model, the matter shall be referred for resolution in accordance with Schedule Part 20 (Dispute Resolution Procedure).

Time is Money Join Law Insider Premium to draft better contracts faster.