Main Step-up Transformer Sample Clauses

Main Step-up Transformer. The main step-up transformer will be an outdoor mineral oil filled, forced air cooled, three winding 34.5/230 kV three phase transformer, rated at 80/106/133 MVA OA/FA/FAA. The transformer shall be connected grounded wye on the 34.5 kV side, and grounded wye on the 230 kV side with a delta tertiary winding and no-load tap changer. The transformer will be equipped with surge arresters, current transformers, ANSI standard accessories and a continuous on-line gas monitor. The transformer foundation design includes an oil containment system.
AutoNDA by SimpleDocs

Related to Main Step-up Transformer

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx Communications has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx Communications. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will make alternative arrangements available to Xxxx Communications (e.g. hairpinning).

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.