Mapping schema of Target Users Sample Clauses

Mapping schema of Target Users. As can be seen, the schema aligns target users categories (see section 4.5 Target user tables) with the professions / type of workplace fields of the expert list. The mapping overview is split into:  macro categories  specific target users categories and their general roles  profession  type of workplace 1.1 User Requirements and Use Cases. (Xxxxxxxxx et al. 2010), which was based on target user groups used in other projects and existing literature on defining target users. The schema has been further refined based on the practical experiences of setting up the user group of experts and the feedback in the user surveys. We found that the relation between target user categories (for details, see section 4.5 Target user tables) and the type of professions and workplaces indicated in the expert user list and on the portal are often hard to match, since a lot of people are cross-domain experts. For instance, performers are often also teachers, students frequently work in a cultural heritage institution as well, and ICT staff can work in the archive of a theatre. Therefore, the overview of ‘Type of workplace’ in Figure 1: Mapping schema of Target Users above contains an overview of the most common categories and have not explicitly been linked to the specific target user categories. Futhermore, some professions were either removed or refined. The profession “lawyer” used in the first version of the mapping schema was for instance too generic and not per se relevant for ECLAP, but IPR experts are indeed an important target user group (especially for Working Group B: IPR and Business Models for Content). The target user categoryCommunity centres’ was also removed, since it was deemed as marginally relevant and not as a core target user group. 2.1. The table below shows the comparison amongst these two different categorizations. By doing so, we obtained categories employed by actual target users in their ECLAP portal profiles, matched with information included in the fields of the expert's list.
AutoNDA by SimpleDocs

Related to Mapping schema of Target Users

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Minimum Data Necessary Shared The Provider attests that the Student Data request by the Provider from the LEA in order for the LEA to access the Provider’s products and/or services is limited to the Student Data that is adequate, relevant, and limited to what is necessary in relation to the K-12 school purposes for which it is processed.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Licensing Schemes and Geographic Scope The following provisions do not apply to Quintiq Last Mile Edition (5MB-LEQ) nor to Quintiq Last Mile Shipments (for Retail) (5MP-LMQ) nor to Quintiq Last Mile Shipments (for Express) (5MP-LMQ-X). For Quintiq Last Mile Edition (5MB-LEQ), Quintiq Last Mile Shipments (for Retail) (5MP-LMQ) and Quintiq Last Mile Shipments (for Express) (5MP-LMQ-X), please refer to section 5 hereinafter.

  • Target Population TREATMENT FOR ADULT (TRA) Target Population

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process. 4.2.2 Notwithstanding BellSouth’s general duty to unbundle local circuit switching, BellSouth shall not be required to unbundle local circuit switching for Louisville Telephone when Louisville Telephone serves an end-user with four (4) or more voice-grade (DS-0) equivalents or lines served by BellSouth in one of the following MSAs: Atlanta, GA; Miami, FL; Orlando, FL; Ft. Lauderdale, FL; Charlotte-Gastonia-Rock Hill, NC; Greensboro-Winston Salem-High Point, NC; Nashville, TN; and New Orleans, LA, and BellSouth has provided non- discriminatory cost based access to the Enhanced Extended Link (EEL) throughout Density Zone 1 as determined by NECA Tariff No. 4 as in effect on January 1, 1999. 4.2.3 In the event that Louisville Telephone orders local circuit switching for an end user with four (4) or more DS0 equivalent lines within Density Zone 1 in an MSA listed above, BellSouth shall charge Louisville Telephone the market based rates in Exhibit B for use of the local circuit switching functionality for the affected facilities.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.