Mass Diagram Sample Clauses

Mass Diagram. The Contractor shall prepare a mass diagram showing in as much detail as the Engineer may consider necessary the programmed movement of the earth for measurement purposes. The programme for earthworks shall be submitted for the approval of the Engineer before the commencement of the Works. Such approval shall not be deemed to relieve the Contractor of any of his responsibilities under the Contract. The Contractor shall before preparing his earthworks programme, carry out such soil testing as necessary to determine the suitability of materials for use in the Works.
AutoNDA by SimpleDocs

Related to Mass Diagram

  • Program Manager Owner may designate a Program Manager to administer the Project and this Contract. In lieu of a Program Manager, Design Professional may be designated to perform the role of Program Manager. The Program Manager may also be designated as the Owner’s Representative, and if no Owner’s Representative is designated, the Program Manager shall be the Owner’s Representative.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • TEMPLATE That certain three well drilling template acquired, inter alia, by Seller for use in connection with the drilling of the OCS-G 7049 #5 Well.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Layout a. Estimate and quantity sheet (1) List of all bid items (2) Bid item quantities (3) Specification item number (4) Paid item description and unit of measure b. Basis of estimate sheet (list of materials) c. General notes and specification data. d. Condition diagram (1) Highway and intersection design features (2) Roadside development (3) Traffic control including illumination e. Plan sheet(s) (1) Existing traffic control that will remain (signs and markings) (2) Existing utilities (3) Proposed highway improvements (4) Proposed installation (5) Proposed additional traffic controls (6) Proposed illumination attached to signal poles. (7) Proposed power pole source f. Notes for plan layout g. Phase sequence diagram(s) (1) Signal locations (2) Signal indications (3) Phase diagram (4) Signal sequence table (5) Flashing operation (normal and emergency) (6) Preemption operation (when applicable) (7) Contact responsible Agency to obtain interval timing, cycle length and offset h. Construction detail sheets(s) (1) Poles (State standard sheets) (2) Detectors (3) Pull Box and conduit layout (4) Controller Foundation standard sheet (5) Electrical chart i. Marking details (when applicable)