Master’s Degree in a relevant field, based on Division Director discretion Sample Clauses

Master’s Degree in a relevant field, based on Division Director discretion. 1 from an accredited college or university - 3% of the base hourly wage.
AutoNDA by SimpleDocs

Related to Master’s Degree in a relevant field, based on Division Director discretion

  • Selection Criteria for Awarding Task Order The Government will award to the offeror whose proposal is deemed most advantageous to the Government based upon an integrated assessment using the evaluation criteria. The Government will evaluate proposals against established selection criteria specified in the task order RFP. Generally, the Government's award decision will be based on selection criteria which addresses past performance, technical acceptability, proposal risk and cost. Among other sources, evaluation of past performance may be based on past performance assessments provided by TO Program Managers on individual task orders performed throughout the life of the contract. The order of importance for the factors will be identified in the RFP for the specified task order.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Teaching Loads The range of teaching loads, number of preparations and number of pupil contacts required should provide for effective instruction and meaningful teacher-student interaction. DPS and the Association agree to work together to seek increased state funding to decrease class size. The principal shall report to the CSC, after the roster verification process, the number of students in each class and this will be published in the CSC minutes on the school’s website. For the purposes of this section, a “class” shall be defined as any general education, including electives and model one classes. Upon request, after the roster verification process, the District shall provide the Association with the student information management system data regarding class enrollment.

  • Development Milestones In addition to its obligations under Paragraph 7.1, LICENSEE specifically commits to achieving the following development milestones in its diligence activities under this AGREEMENT: (a) (b).

  • Taxes and Fees Imposed Directly On Either Providing Party or Purchasing Party 11.2.1 Taxes and fees imposed on the providing Party, which are not permitted or required to be passed on by the providing Party to its customer, shall be borne and paid by the providing Party.

  • Performance while Dispute is Pending Notwithstanding the existence of a dispute, the Supplier must continue without delay to carry out all of its responsibilities under the Contract that are not affected by the dispute. If the Supplier fails to continue without delay to perform its responsibilities under the Contract, in the accomplishment of all undisputed work, the Supplier will bear any additional costs incurred by Sourcewell and/or its Participating Entities as a result of such failure to proceed.

  • Project Steering Committee (a) The Recipient shall establish and maintain at all times until the completion of the Project, the Project Steering Committee with a composition, mandate and resources satisfactory to the Association.

  • METHOD OF AWARD AND PROCEDURE FOR AWARDING A SOW AGREEMENT 5.1. Contractor selection, or the determination to terminate the SOW-RFP without award, shall be done in the best interest of the State.

Time is Money Join Law Insider Premium to draft better contracts faster.