Materials, Labour and Plant Sample Clauses

Materials, Labour and Plant. 1.5.1 The Contractor shall provide everything necessary for the proper execution of the works including all transport, plant, tackle, machinery, materials and labour of every kind.
AutoNDA by SimpleDocs
Materials, Labour and Plant. 5.9.2 In line three, after the word ‘new’ include the words “, of good quality and fit for their purpose.” 5.11 Compliance with laws 5.11.10 Delete "date of closing of tenders" and replace with "Date of Acceptance of Tender". After the words “otherwise provided in the Contract”add the words “and not reasonably foreseeable by an experienced Contractor at the Date of Acceptance of Tender.”
Materials, Labour and Plant. Delete clause 5.8.5 and replace as follows:
Materials, Labour and Plant. 3.8.1 NZTA shall, except where otherwise specified in the Contract Documents, supply at its own Cost everything necessary for the completion of the Contract Works and the performance of its obligations under the contract including minor items not expressly mentioned in the Contract Documents and of a type not normally detailed but necessary for completion and performance of the Contract Works.

Related to Materials, Labour and Plant

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • CHILD LABOUR 19.1 The Contractor represents and warrants that neither it, nor any of its suppliers is engaged in any practice inconsistent with the rights set forth in the Convention on the Rights of the Child, including Article 32 thereof, which, inter alia, requires that a child shall be protected from performing any work that is likely to be hazardous or to interfere with the child's education, or to be harmful to the child's health or physical mental, spiritual, moral or social development.

  • Contractor Work Hours and Safety Standards Contractor shall ensure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and County safety and health regulations and laws.

  • Materials Stored If the Application for Payment includes materials delivered and suitably stored at the Site but not incorporated in the work, they shall, if required by the Owner or the Design Professional, be conditional upon submission by the Contractor of bills of sale or such other procedure as will establish the Owner's title to such material or otherwise adequately protect the Owner's interest. The Contractor is responsible for the existence, protection, and, if necessary, replacement of materials until execution of the Final Certificate of the Design Professional. The Owner shall not pay for any materials stored off-site.

  • MATERIALS AND WORKMANSHIP Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

  • GMP The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est. COW): $ CM/GC Fee ( % of Est. COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.

  • CONTRACT WORK HOURS AND SAFETY STANDARDS As per the Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708), where applicable, all Customer Purchase Orders in excess of ,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

  • Training and Promotion a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

  • EQUIPMENT AND LABOR The Contractor shall furnish all tools, equipment, apparatus, facilities, transportation, labor, and material necessary to furnish the Services, the Services to be performed at such times and places as directed by and subject to the approval of the authorized District representative indicated in the Work specifications attached hereto.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.