CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.
BRAND NAME OR EQUALS/DEVIATIONS Unless otherwise specified, the mention of a particular manufacturer’s brand name or number in the specifications does not imply that this particular good is the only one that will be considered for purchase. This reference is intended solely to designate the type or quality of good that will be acceptable. Equal offers will be considered and must include descriptive literature and/or specifications. Failure to provide descriptive literature and/or specifications with equal offers will result in the disqualification of the bid. The determination as to whether any alternate good or service is or is not equal shall be made solely by the County and such determination shall be final and binding upon all bidders. The County reserves the right to request and review additional information to make such a determination. Although the County provides for the consideration of alternate bids, it reserves the right to make an award in the best interest of the County. Award may not necessarily be given to the lowest bid offered. The Bidder shall be responsible for reading very carefully, and understanding completely, the requirements and the specifications of the items bid upon. Unless the bid is in response to a “Brand Name or Equal” requirement, deviations from the specifications will only be considered if requested in writing prior to the date and time specified for receipt of bids. Deviations, if accepted, will be specifically addressed in writing via an addendum to this Invitation for Bids. Any goods or services that are not in compliance with the specifications will not be accepted.
Failure to Supply Workmen or Materials or to Prosecute the Work A Notice of Non-Compliant Work may be issued for failure of the Contractor to supply enough workers or enough materials or proper materials to prosecute the Work. A Notice of Non-Compliant Work in such event may be based on Article 3.3.2 (Competent Management of Time), and upon the definition of Work as set forth under Paragraph 1.1.9.58.
Millwright Xxxxx be to assist and work under the direction and instructions I or A. He will work alone at times performing assignments in keeping with his training. During the course of his year, training must become proficient in good practices in the areas of fitting, aligning, lubricating and the operation of all shop tools and machines. In addition to the foregoing, he will be exposed to and the process of learning techniques required in trouble shooting key production machinery, pipe fitting, basic welding and machining but not be expected to display a high degree of proficiency in these areas at this point. Millwright Must be capable of performing the tasks of fittings, aligning, lubricating an able to operate all shop tools and machines. Must under direction become proficient in basic welding and pipe fitting as well as dismantling and reassembly of plant equipment. Under direction,will continueto develop skills in trouble shooting all plant equipment and improve his skills at machining part and be exposed to basic principles of hydraulics and pneumatic. He may work alone frequently, but occasionally will require direction and instructions form Millwright I or A. Millwright 11: be capable, without direction of fitting, aligning and lubrication and taking apart and reassembling plant equipment. In addition, is expected to be able to weld, operate shop tools and do pipe fitting as required. Must under direction, become proficient at effective methods of trouble shooting and repairing hydraulic, pneumatic and mechanical faults in plant machinery. I: Must be capable without direction of performing all practices under Xxxxxxxxxx Must under directionbecomeproficient at reading and understanding blueprints, all phases of installing new equipment, laying out hydraulic and mechanical drives and meet speed and power requirements correctly. Xxxxxxxxxx "A": Must he capable without direction, of performing all under Xxxxxxxxxx X, and Must take full responsibility for work done by himself or his assistant. Must he in possession of a Millwright Certificate or a Machinist Certificate or Welder Certificate. Millwrightspresently employed in this classification will not be required to have a Certificate.
Metode Penelitian Penelitian ini bersifat deskriptif. Jenis penelitian yang digunakan adalah hukum normatif. Sumber data yang dipergunakan pada penelitian ini adalah data sekunder yang terdiri dari :
Tell-tale Tell-tale optional. If it exists, its function shall be carried out by the tell-tale required for the front and rear position lamps.
Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.
CONTRACT XXXXXXXX Contractor and the distributors/resellers designated by the Contractor, if any, shall provide complete and accurate billing invoices to each Authorized User in order to receive payment. Xxxxxxxx for Authorized Users must contain all information required by the Contract and the State Comptroller. The State Comptroller shall render payment for Authorized User purchases, and such payment shall be made in accordance with ordinary State procedures and practices. Payment of Contract purchases made by Authorized Users, other than Agencies, shall be billed directly by Contractor on invoices/vouchers, together with complete and accurate supporting documentation as required by the Authorized User. Submission of an invoice and payment thereof shall not preclude the Commissioner from reimbursement or demanding a price adjustment in any case where the Product delivered is found to deviate from the terms and conditions of the Contract or where the billing was inaccurate. Contractor shall provide, upon request of the Commissioner, any and all information necessary to verify the accuracy of the xxxxxxxx. Such information shall be provided in the format requested by the Commissioner and in a media commercially available from the Contractor. The Commissioner may direct the Contractor to provide the information to the State Comptroller or to any Authorized User of the Contract.
Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.
Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.