Maximum Height and Size of Proposed Buildings Sample Clauses

Maximum Height and Size of Proposed Buildings. See Section 3.1.2 of this Agreement and the City Approvals.
AutoNDA by SimpleDocs

Related to Maximum Height and Size of Proposed Buildings

  • BUILDINGS AND STRUCTURES 1. Repair or retrofit of buildings less than 45 years old.

  • Application of other Rules and Special Commitments 1. Where a matter is governed simultaneously both by this Agreement and by another international agreement to which both Contracting Parties are parties, nothing in this Agreement shall prevent either Contracting Party or any of its investors who own investments in the territory of the other Contracting Party from taking advantage of whichever rules are more favourable to his case.

  • Scope of Project i. The work to be performed under this Agreement for the Rapid City Metropolitan Transportation Planning Process will be conducted in accordance with the CY 2018 Unified Planning Work Program incorporated in this agreement by reference as Attachment D, and the 2018 Unified Planning Work Program Amendment 2018-01, incorporated in and attached to this agreement as Attachment F.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Ownership of Drawings and Specifications All Drawings, Specifications and copies thereof furnished by the A/E are to remain A/E’s property. These documents are not to be used on any other project, and with the exception of one contract set for each party to the Contract, are to be returned to the A/E, upon request, following completion of the Work.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Use of Buildings and Equipment 21.4.1 The Association shall have the right to use District buildings, sites, and equipment during all reasonable hours for meetings and other Association activities.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.