Mess/Change Shed Facilities Dimension/Construction Requirements and Construction of Sheds. 3.1 All Sheds shall be weatherproof and soundly constructed to an approved standard with sufficient windows and doors, adequate ventilation and lighting. They must have a floor above ground level and be lined on ceilings and walls. 3.2 Mess Shed/s fitted with fly screens are provided for exclusive use of workers and not for the storage of employers’ equipment, tools and materials. 3.3 Shed/s shall provide not less than 0.75 square metres of floor space per person employed at any one time, provided that the area be not less than 4.65 square metres. Fixtures, other than tables and chairs, shall not be included when calculating floor space. 3.4 Where 5 or more persons are employed at one time, the floor area shall not be less than 9 square metres. 3.5 Adequate facilities are to be provided for warmth and for drying clothes eg. strip heaters. 3.6 Provided that 20 or more persons are employed on site at any one time, the employer shall provide a separate shed or sheds for messing, which shall be of such dimension as to provide not less than 0.75 square metres of floor space per person.
Appears in 61 contracts
Samples: Collective Bargaining Agreement, Collective Bargaining Agreement, Collective Bargaining Agreement
Mess/Change Shed Facilities Dimension/Construction Requirements and Construction of Sheds.
3.1 All Sheds shall be weatherproof and soundly constructed to an approved standard with sufficient windows and doors, adequate ventilation and lighting. They must have a floor above ground level and be lined on ceilings and walls.
3.2 Mess Shed/s fitted with fly screens are provided for exclusive use of workers and not for the storage of employers’ equipment, tools and materials.
3.3 Shed/s shall provide not less than 0.75 square metres of floor space per person employed at any one time, provided that the area be not less than 4.65 square metres. Fixtures, other than tables and chairs, shall not be included when calculating floor space.
3.4 Where 5 or more persons are employed at one time, the floor area shall not be less than 9 square metres.
3.5 Adequate facilities are to be provided for warmth and for drying clothes eg. strip heaters.
3.6 Provided that 20 or more persons are employed on site at any one time, the employer shall provide a separate shed or sheds for messing, which shall be of such dimension as to provide not less than 0.75 square metres of floor space per person.
Appears in 14 contracts
Samples: Union Collective Agreement, Certified Agreement, Union Collective Agreement