Minimum Processing Requirements Sample Clauses

Minimum Processing Requirements. The Contractor shall utilize processing subsystems at the Material Recovery Facility capable of complying with product specifications of secondary materials buyers including, but not limited to, product form, size, weight, density, and degree of contamination. In addition, the Contractor shall utilize processing subsystems at the Material Recovery Facility capable of processing a minimum of ninety-five percent (95.0%) by weight of Program Recyclable Materials into Recovered Materials on a monthly basis.‌
AutoNDA by SimpleDocs

Related to Minimum Processing Requirements

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.

  • Bonding Requirements The Contractor is required to furnish a performance bond on the form in a form acceptable to the City, in a sum of not less than [insert bonding level] of the annual amount of the contract to guarantee the faithful performance of this contract. The bond must be approved as to sufficiency and qualifications of the surety by the Controller.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Training Requirements Grantee shall:

  • Minimum System Requirements The following summarizes the minimum office system requirements for all Contractors and Architect/Engineer to possess in order to participate. It is the responsibility of all Contractors and Architect/Engineer to possess these minimum requirements at no additional cost to Princeton University.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!