MINING AND QUARRYING9 A Sample Clauses

MINING AND QUARRYING9 A. Mining of coal and lignite; extraction of peat EC: Investors from countries which are energy suppliers may be prohibited to obtain control of the activity. Unbound for direct branching (incorporation is required). Unbound for extraction of crude petroleum and natural gas. (ISIC rev 3.1: 10)
AutoNDA by SimpleDocs

Related to MINING AND QUARRYING9 A

  • STANDARDS AND QUALITY The Supplier shall at all times during the Contract Period ensure that the Services are delivered in accordance with: the Digital Service Design Manual (and the Supplier shall comply with the processes and procedures set out therein); the Standards; the KPIs; the Methodology; the applicable SOW; and all other applicable provisions of this Contract.

  • ESTIMATED SPEND AND QUANTITIES This Contract is an Indefinite Delivery, Indefinite Quantity (IDIQ)

  • Workmanship and Quality 7.8.1 Employees appropriately qualified will sign all required documentation in accordance with the applicable statutes and regulations.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Mining and Industrial Cooperation 1. The aims of cooperation in mining and industry sectors, carried out in the mutual interest of the Parties and in compliance with their policies, will be: (a) to focus cooperative activities towards sectors where mutual and complementary interests exist; and (b) to build on existing agreements and arrangements already in place between the Parties. 2. Mining and Industrial cooperation may include work in, but not be limited to, the following areas: (a) bio-mining (mining using biotechnology procedures); (b) mining techniques, specially underground mining, and conventional metallurgy; (c) productivity in mining; (d) industrial robotics for mining and other sector applications; (e) informatics and telecommunication applications for mining and industrial plant production; and (f) software development for mining and industrial applications. 3. The Parties will encourage and facilitate, as appropriate, the following activities including, but not limited to: (a) exchange of information, documentation and institutional contacts in areas of interest; (b) mutual access to academic, industrial and entrepreneurial networks in the area of mining and industry; (c) identification of strategies, in consultation with universities and research centres, that encourage joint postgraduate studies, research visits and joint research projects; (d) exchange of scientists, researchers and technical experts; (e) promotion of public/private sector partnerships and joint ventures in the support of the development of innovative products and services specially related to productivity in the sector activities; (f) technology transfer in the areas mentioned in paragraph 2; (g) designing of innovation technology models based in public/private cooperation and association ventures; and (h) information and experience exchange on mining environmental issues.

  • Deliveries and Quantity On each Delivery Date set forth in the table, Seller will deliver the quantity of the Product (as defined below) having Vintages as and if specified, and Buyer will pay the specified Purchase Price, all in accordance with the Agreement. Delivery Dates Delivery Type Quantity Vintage Purchase REC (indicate dates or (indicate (in MWhrs, (month/year, as Price Delivery as generated, as multiple/periodic unless applicable) ($ per MWhr applicable) deliveries, if otherwise unless applicable) indicated) otherwise indicated) Delivery 1 Delivery 2 Delivery 3

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. Purchaser may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net scale in percentage of gross scale, or based on the merchantability factor, whichever is stated in A2. If necessary to assess extent of defect, Purchaser shall make sample saw cuts or wedges. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • SMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • EMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

Time is Money Join Law Insider Premium to draft better contracts faster.