MOBILIZATIONS, CONCURRENT WORK, PHASED TURNOVER Sample Clauses

MOBILIZATIONS, CONCURRENT WORK, PHASED TURNOVER. Subcontractor acknowledges that the Project will have a phased turnover in accordance with the Project Schedule and that multiple mobilizations will be required and are included as part of the Subcontract Agreement. Additionally, Subcontractor acknowledges that the Project has multiple building areas and concurrent work on each building area will be required in order to complete on schedule, and that all costs for doing same are included. The Subcontractor further acknowledges that separate crews, supervision, material deliveries, shop drawings, inspections, etc will be required for each of the building areas in order to maintain the project schedule, and that all costs for doing same are included. Subcontractor shall mobilize within three (3) calendar days of Contractor’s notification with complete work force, materials, supervision, labor and equipment available to maintain and complete scheduled activities Subcontractor also acknowledges that subsequent bid packages and scopes of work will proceed and/or follow work under this agreement. Subcontractor is herein required to schedule and coordinate with such subsequent bid packages to ensure continuity of work. Critical work Subcontractors (with equipment and logistical constraints) agrees to mobilize the field supervisor full time to the project at minimum of 3 days before scheduled start of work to understand the scope of work, issue RFI's, understand logistics, etc. to enable all trades to begin executing work in FULL force the subcontractor is scheduled to commence work.
AutoNDA by SimpleDocs

Related to MOBILIZATIONS, CONCURRENT WORK, PHASED TURNOVER

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Construction Phase Part 1 –

  • Project Completion Part 1 – Material Completion

  • Completion Date The Work under this Contract shall be completed by midnight of the date required in the Contract as the Material Completion and Occupancy Date unless extended by approved requests for extension of time.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Completion of Punch List items 14.4.1 All items in the Punch List shall be completed by the Concessionaire within 90 (ninety) days of the date of issue of the Provisional Certificate and for any delay thereafter, other than for reasons solely attributable to the Authority or due to Force Majeure, the Authority shall be entitled to recover Damages from the Concessionaire to be calculated and paid for each day of delay until all items are completed, at the lower of (a) 0.1% (zero point one per cent) of the Performance Security, and (b) 0.2% (zero point two per cent) of the cost of completing such items as estimated by the Independent Engineer. Subject to payment of such Damages, the Concessionaire shall be entitled to a further period not exceeding 120 (one hundred and twenty) days for completion of the Punch List items. For the avoidance of doubt, it is agreed that if completion of any item is delayed for reasons solely attributable to the Authority or due to Force Majeure, the completion date thereof shall be determined by the Independent Engineer in accordance with Good Industry Practice, and such completion date shall be deemed to be the date of issue of the Provisional Certificate for the purposes of Damages, if any, payable for such item under this Clause 14.4.1.

Time is Money Join Law Insider Premium to draft better contracts faster.