MPPT based Charge Controller 2) Suitable Sample Clauses

MPPT based Charge Controller 2) Suitable. DC Distribution system board with Connectors/Wires for the respective components of DPMCU. 3) Battery Health/Charging Indicator Graphical Or 4) Digital Volt and Ampere meter both side Charging and Load Connecting Cables included for the respective items of DPMCU, Hybrid i.e. SPV and GRID. Preference to SPV Charging. Xx.Xx. Particular Specifications Bidder to confirm Matching the Specification (Yes/ No/ Remarks) 8.5 Battery (with Steel rack) Type : LMS Industrial Tubular. Recommended Make: Exide, Okaya, Livgaurd, Luminous. Min. Rating 12 V; 100 Ah. Battery of suitable capacity to run the system for minimum 3 (Three) Days in case of cloudy Weather. Warranty of Battery 4 years replacement warranty against manufacturing defect. 8.6 Battery Charging SPV Charging: Up to 15 Amp. Grid Charging: 90-300 V AC. 15 Amps, In case SPV not available. 8.7 Protections 1. Short Circuit & Overload on both Battery and load. High Charging Voltage and Neutral Protection.
AutoNDA by SimpleDocs
MPPT based Charge Controller 2) Suitable. DC Distribution system board with Connectors/Wires for the respective components of DPMCU. 3) Battery Health/Charging Indicator Graphical Or 4) Digital Volt and Ampere meter both side Charging and Load Connecting Cables included for the respective items of DPMCU,

Related to MPPT based Charge Controller 2) Suitable

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in Schedule A (attached) are formally approved as actual costs for fiscal year 2016-17, and as estimated costs for fiscal year 2018-19 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2018, for further allocation to federal grants and contracts performed by the respective county departments. County of Tehama - 2 - April 30, 2018

  • Claims Allocation and Handling Agreement General Clauses 16 and 17 of the Claims Allocation and Handling Agreement provide that claims between parties to it are limited to specified amounts unless the parties expressly contract otherwise.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Distribution of UDP and TCP queries DNS probes will send UDP or TCP “DNS test” approximating the distribution of these queries.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!