NHSBT Regional Consultative Frameworks Sample Clauses

NHSBT Regional Consultative Frameworks. 4.2.1 There is a need for consultation and discussion with staff at a more regional/local level. It is essential that there is a two way flow of communication between the local/regional committees and national strategic committees so that all views and opinions are considered. Consultation at a regional level is achieved as follows:-
AutoNDA by SimpleDocs

Related to NHSBT Regional Consultative Frameworks

  • Technical Consultations 1. A Party may initiate technical consultations with another Party through the respective contact points with the aim of resolving any matter arising under this Chapter.

  • JOINT CONSULTATION 21.01 The parties acknowledge the mutual benefits to be derived from joint consultation and are prepared to enter into discussion aimed at the development and introduction of appropriate machinery for the purpose of providing joint consultation on matters of common interest.

  • Tribal Consultation 1. For FEMA Undertakings on Tribal lands or potentially affecting properties of religious and cultural significance to Tribes, and where no tribe-specific consultation agreements or protocols are in place, FEMA shall consult with affected Tribe(s) or in accordance with 36 CFR Part 800. In determining who the affected Tribe(s) may be, FEMA will first establish that it is a type of Undertaking with potential to affect historic properties with religious and cultural significance and may consult with the SHPO and Tribe(s), and may access the National Park Service (NPS) Native American Consultation Database or other tools to identify geographic tribal interests.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Operational Control Directing the operation of the Transmission Facilities Under ISO Operational Control to maintain these facilities in a reliable state, as defined by the Reliability Rules. The ISO shall approve operational decisions concerning these facilities, made by each Transmission Owner before the Transmission Owner implements those decisions. In accordance with ISO Procedures, the ISO shall direct each Transmission Owner to take certain actions to restore the system to the Normal State. Operational Control includes security monitoring, adjustment of generation and transmission resources, coordination and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Control Areas, voltage reductions and Load Shedding, except that each Transmission Owner continues to physically operate and maintain its facilities.

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • Design Professional Contract The Contract between the Owner and the Design Professional for the design of the Project.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.