Non Code Testing Major Equipment Verification Sample Clauses

Non Code Testing Major Equipment Verification. Report the performance of major equipment, using data collected either during Unit 6 Performance Testing or individual Equipment Verification Testing. If performance guarantees are not met, to establish an estimate of the shortfall value, for possible Code Testing.
AutoNDA by SimpleDocs

Related to Non Code Testing Major Equipment Verification

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Equipment, Etc Each Grantor shall, (i) within ten (10) days after a written request by the Administrative Agent, in the case of Equipment now owned, and (ii) following a request by the Administrative Agent pursuant to subclause (i) above, within ten (10) days after acquiring any other Equipment, deliver to the Administrative Agent, any and all certificates of title, and applications therefor, if any, of such Equipment and shall cause the Administrative Agent to be named as lienholder on any such certificate of title and applications. No Grantor shall permit any such items to become a fixture to real estate or an accession to other personal property unless such real estate or personal property is the subject of a fixture filing (as defined in the UCC) creating a first priority perfected Lien in favor of the Administrative Agent.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Facility Type    Call Sign    Exp Date TV Broadcast Station License WBRE-TV 08/01/2007 (Channel 28, Xxxxxx-Xxxxx, Pennsylvania) DTV Facility WBRE-DT 08/01/2007 (Channel 11, Xxxxxx-Xxxxx, Pennsylvania) TV Translator Station License W24BL 08/01/2007 TV Translator Station License W30AN 08/01/2007 TV Translator Station License W51BP 08/01/2007 TV Translator Station License W64AL 08/01/2007 Transmit-Only Earth Station License E910642 11/01/2011 Transmit-Receive Earth Station License E020058 05/03/2017 TV Pickup KA35201 08/01/2007 TV Pickup KA35245 08/01/2007 TV Pickup KA74870 08/01/2007 TV Pickup KC62824 08/01/2007 Broadcast Auxiliary KF5726 08/01/2007 TV Studio Transmitter Link KGH66 08/01/2007 R/P Base Mobile System KGU973 08/01/2007 TV Pickup KK4138 08/01/2007 TV Pickup KL2535 08/01/2007 TV Pickup KP4407 08/01/2007 R/P Base Mobile System KQB618 08/01/2007 TV Pickup KR7688 08/01/2007 TV Pickup KR7693 08/01/2007 TV Pickup KR7771 08/01/2007 TV Pickup KS2001 08/01/2007 TV Pickup KY2899 08/01/2007 R/P Mobile KY5608 08/01/2007 TV Studio Transmitter Link KZO21 08/01/2007 TV Intercity Relay WFW575 08/01/2007 TV Intercity Relay WGI290 08/01/2007 TV Intercity Relay WHB674 08/01/2007 TV Intercity Relay WLI324 08/01/2007 TV Intercity Relay WLI325 08/01/2007 TV Intercity Relay WLI337 08/01/2007 TV Intercity Relay WMF322 08/01/2007 TV Intercity Relay WMF323 08/01/2007

  • Budget For Tenant Improvements A preliminary detailed breakdown by trade of the costs incurred or that will be incurred in connection with the design and construction of the Tenant Improvements is set forth on Schedule 3 attached hereto (the “Budget”). The Budget is based upon the TI Construction Drawings approved by Tenant and shall include a payment to Landlord of administrative rent (“Administrative Rent”) equal to 1.5% of the TI Costs, which Administrative Rent shall include, without limitation, all out-of-pocket costs, expenses and fees incurred by or on behalf of Landlord arising from, out of, or in connection with monitoring the construction of the Tenant Improvements and Changes, and shall be payable out of the TI Fund. Landlord shall provide Tenant with a final Budget promptly following approval of the TI Construction Drawings by Landlord and Tenant. The Budget shall be subject to Tenant’s review and approval which approval shall not be unreasonably withheld, conditioned or delayed by Tenant. Tenant shall have the right to approve any use of the contingency in the Budget by Landlord; provided, however, that, Tenant’s approval shall not be unreasonably withheld, conditioned or delayed, and the contingency shall not be available for use by Tenant for any Changes until all unforeseen conditions, changes to resulting from governmental agencies and the like have first been paid for out of the contingency.

  • Specifications Shipper will ensure that all of its Products tendered at the Origin Point for transportation on the Pipeline System meet the applicable specifications for the Product as set forth in the Tariff (as defined below) (the “Specifications”).

  • Project Schedule Contractor shall perform the Work in accordance with the Project Schedule.

  • Equipment Failures In the event of equipment failures beyond the Administrator's control, the Administrator shall take reasonable and prompt steps to minimize service interruptions but shall have no liability with respect thereto. The Administrator shall develop and maintain a plan for recovery from equipment failures which may include contractual arrangements with appropriate parties making reasonable provision for emergency use of electronic data processing equipment to the extent appropriate equipment is available.

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!