Objective tests Sample Clauses

Objective tests. Assessments will be used throughout the year to determine mastery of curriculum objectives. Such assessments may include text publisher instruments, teacher-developed tests, and test instruments from other sources which provide appropriate diagnostic and mastery information.
AutoNDA by SimpleDocs

Related to Objective tests

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Evaluation Criteria 5.2.1. The responses will be evaluated based on the following: (edit evaluation criteria below as appropriate for your project)

  • Positive Test Results In the event an employee tests positive for drug use, the employee will be provided, in writing, notice of their right to explain the test results. The employee may indicate any relevant circumstance, including over the counter or prescription medication taken within the last thirty (30) days, or any other information relevant to the reliability of, or explanation for, a positive test result.

  • Performance Targets Threshold, target and maximum performance levels for each performance measure of the performance period are contained in Appendix B.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Root Cause Analysis Upon Vendor's failure to provide the Services in accordance with the applicable Service Levels (for any reason other than a Force Majeure Event) Vendor will promptly (a) perform a root-cause analysis to identify the cause of such failure, (b) provide Prudential with a report detailing the cause of, and procedure for correcting, such failure, (c) obtain Prudential's written approval of the proposed procedure for correcting such failure, (d) correct such failure in accordance with the approved procedure, (e) provide weekly (or more frequent, if appropriate) reports on the status of the correction efforts, and (f) provide Prudential with assurances satisfactory to Prudential that such failure has been corrected and will not recur.

  • Selection Criteria Each Contract is secured by a new or used Motorcycle. No Contract has a Contract Rate less than 1.00%. Each Contract amortizes the amount financed over an original term no greater than 84 months (excluding periods of deferral of first payment). Each Contract has a Principal Balance of at least $500.00 as of the Cutoff Date.

  • Performance Levels (a) The Performance Levels which apply to the performance by the respective Parties of their obligations under this Agreement are set out in Part 1 of Schedule 5. A failure by either Party to achieve the relevant Performance Level will not constitute a breach of this Agreement and the only consequences of such failure as between the Parties shall be the consequences set out in this Clause 5.6. (b) If the Operator does not comply with the Operator Performance Level then the Access Holder must pay to QR Network the amount determined in accordance with Schedule 5 as part of the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following QR Network becoming entitled to that amount. Where there is no next Billing Period, the Operator must pay such amount to QR Network within fourteen (14) days after receipt of a Tax Invoice from QR Network. (c) If QR Network does not comply with the QR Network Performance Level then QR Network will credit to the Access Holder the amount determined in accordance with Schedule 5 by way of a deduction from the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following the Access Holder becoming entitled to that amount. Where there is no next Billing Period, QR Network must pay such amount to the Access Holder within fourteen (14) days after receipt of a Tax Invoice from the Access Holder. (d) The Parties must, if requested by either Party, meet to review the Performance Levels subject to such review not occurring within six (6) Months after the Commitment Date or any previous review of the Performance Levels. If either Party notifies the other that it considers that the Performance Levels are no longer appropriate, the Parties may agree on varied Performance Levels and any associated variations to the Agreement including the Base Access Charges and the Train Service Description. If the Parties are unable to agree to such variations, then the existing Performance Levels shall continue to apply unless varied by QR Network in accordance with the provisions of Clause 5.6(e). (e) In the event that the Access Holder and/or the Operator (i) does not comply in any material respect with the Train Service Description; and (ii) the Access Holder fails to demonstrate to the reasonable satisfaction of QR Network when requested to do so, that the Access Holder will consistently comply with the Train Service Description for the remainder of the Term then, following consultation with the Access Holder, QR Network will be entitled to: (iii) vary the Train Service Description to a level it reasonably expects to be achievable by the Access Holder for the remainder of the Term having regard to the extent of previous compliance with the Train Service Description (ignoring, for the purpose of assessing previous compliance, any non-compliance to the extent that the non-compliance was attributable to a Railway Operator (other than the Access Holder) or to QR Network); and (iv) vary the Agreement (including, without limitation, the Operator Performance Level and the Base Access Charges) to reflect the impact of the change in the Train Service Description. (f) The Access Holder shall be entitled to dispute any variation proposed by QR Network pursuant to Clause 5.6(e) and such dispute will be referred to an expert for resolution in accordance with Clause 17.3.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!