Operational Implementation of Water Utilization Rule Sample Clauses

Operational Implementation of Water Utilization Rule. The reasonable use of water aims at the maximum or optimum utilization of the water resources taking account of the mobility and probabilistic uncertainty of water. The former section defines that maximum utilization is to minimize the ineffective release of water to the sea under the condition of maintaining the required flows or balances of demands and supplies at the selected stations by means of taking appropriate actions on the basis of the monitored information. As reiterated, the supply capacity or the potential of water resources varies from time to time and from place to place. The water demand fluctuates from time to time as well due to various causes. The effective rainfall for agricultural cultivation, which is decisive to define the diversion requirement, depends on variable precipitation. In case the water availability in the upstream reach area is just enough and the downstream reach area is suffering shortage, appropriate controls of demands in both areas may ensure an equivalent use. In case of the contrary, the upstream reach may use the water to the maximum extent consuming even the water that otherwise be released to the downstream reach in normal situation. Agriculture with by far the largest demand has flexibility against water demand to some extent within a certain period. Accordingly, a water supply corresponding to the controlled demand may not affect seriously only if the shortage due to the control is made up within a few days. In this consequence, daily monitoring and daily balance forecasting are required to realize a reasonable water use by means of adaptable actions to cope with the hydro-meteorological fluctuation. Eventually, the implementation of Rules of PDIES and PWUM are on daily basis. Along this line, daily implementation of maintenance of flows and water quality, or taking action, are technically feasible although actual operation may be a 10-day interval taking account of the costs to be incurred by operation. The Rules are mostly frameworks so that further guidelines, standards and detailed procedures are necessary to implement them effectively in the actual fields. The implementation becomes more concrete when such guidelines are formulated. However, for the present study, a simplified scenario is assumed preliminarily to examine the implementation of the Rules. Monitoring of hydro-meteorological conditions and water use is conducted daily or on real time base under the rules of PDIES and PWUM. The schedule of dem...
AutoNDA by SimpleDocs

Related to Operational Implementation of Water Utilization Rule

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

  • Project Implementation 2. The Borrower shall:

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • DISASTER RECOVERY AND BUSINESS CONTINUITY The Parties shall comply with the provisions of Schedule 5 (Disaster Recovery and Business Continuity).

  • Operational Procedures In order to minimize operational problems, it will be necessary for trade information to be supplied in a secure manner by the Subadviser to the Fund’s Service Providers, including: JPMorgan Chase Bank, National Association (the “Custodian”), Virtus Fund Services (the “Fund Administrator”) BNY Mellon Investment Servicing (US) Inc., (the “Sub-Accounting Agent”), any Prime Broker to the Series, and all other Counterparties/Brokers as required. The Subadviser must furnish the Fund’s service providers with required daily information as to executed trades in a format and time-frame agreed to by the Subadviser, Custodian, Fund Administrator, Sub-Accounting Agent and Prime Broker/Counterparties and designated persons of the Fund. Trade information sent to the Custodian, Fund Administrator, Sub-Accounting Agent and Prime Broker/Counterparties must include all necessary data within the required timeframes to allow such parties to perform their obligations to the Series. The Sub-Accounting Agent specifically requires a daily trade blotter with a summary of all trades, in addition to trade feeds, including, if no trades are executed, a report to that effect. Daily information as to executed trades for same-day settlement and future trades must be sent to the Sub-Accounting Agent no later than 4:30 p.m. (Eastern Time) on the day of the trade each day the Fund is open for business. All other executed trades must be delivered to the Sub-Accounting Agent on Trade Date plus 1 by Noon (Eastern Time) to ensure that they are part of the Series’ NAV calculation. (The Subadviser will be responsible for reimbursement to the Fund for any loss caused by the Subadviser’s failure to comply with the requirements of this Schedule A.) On fiscal quarter ends and calendar quarter ends, all trades must be delivered to the Sub-Accounting Agent by 4:30 p.m. (Eastern Time) for inclusion in the financial statements of the Series. The data to be sent to the Sub-Accounting Agent and/or Fund Administrator will be as agreed by the Subadviser, Fund Administrator, Sub-Accounting Agent and designated persons of the Fund and shall include (without limitation) the following:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • General Program Requirements Subrecipient shall adhere, but not be limited to, the following requirements for all programs:

  • BUSINESS CONTINUITY PLAN The Warrant Agent shall maintain plans for business continuity, disaster recovery, and backup capabilities and facilities designed to ensure the Warrant Agent’s continued performance of its obligations under this Agreement, including, without limitation, loss of production, loss of systems, loss of equipment, failure of carriers and the failure of the Warrant Agent’s or its supplier’s equipment, computer systems or business systems (“Business Continuity Plan”). Such Business Continuity Plan shall include, but shall not be limited to, testing, accountability and corrective actions designed to be promptly implemented, if necessary. In addition, in the event that the Warrant Agent has knowledge of an incident affecting the integrity or availability of such Business Continuity Plan, then the Warrant Agent shall, as promptly as practicable, but no later than twenty-four (24) hours (or sooner to the extent required by applicable law or regulation) after the Warrant Agent becomes aware of such incident, notify the Company in writing of such incident and provide the Company with updates, as deemed appropriate by the Warrant Agent under the circumstances, with respect to the status of all related remediation efforts in connection with such incident. The Warrant Agent represents that, as of the date of this Agreement, such Business Continuity Plan is active and functioning normally in all material respects.

Time is Money Join Law Insider Premium to draft better contracts faster.