Other Operational Stakeholders Sample Clauses

Other Operational Stakeholders 
AutoNDA by SimpleDocs

Related to Other Operational Stakeholders

  • Operational Standards Customer shall furnish, install, operate and maintain in good order and repair, all without cost to the City, all equipment required for the safe operation of the Facility in parallel with the City’s electric distribution system. This includes, but is not limited to, equipment necessary to:

  • Professional Staff A. 1. This Article shall apply to all members of the unit except teaching faculty, librarians, Demonstration Teachers and Demonstration Specialists — A.

  • Professional Standards The Contractor agrees to maintain the professional standards applicable to its profession and to Contractors doing business in the United States Virgin Islands.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Technical Standards The Generation System shall be installed and operated by the Interconnection Customer consistent with the requirements of this Agreement; the Technical Requirements; the applicable requirements located in the National Electrical Code (NEC); the applicable standards published by the American National Standards Institute (ANSI) and the Institute of Electrical and Electronic Engineers (IEEE); and local building and other applicable ordinances in effect at the time of the installation of the Generation System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Operational Support Systems (OSS 2.13.1 BellSouth has developed and made available the following electronic interfaces by which <<customer_name>> may submit LSRs electronically. LENS Local Exchange Navigation System EDI Electronic Data Interchange TAG Telecommunications Access Gateway

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Operational Manual (a) The Multiplex Licensee agrees to develop an operational manual in consultation with all Access Seekers to deal with technical and operational matters that arise under or in connection with this Agreement, or the supply of the Multiplex Transmission Service (Operational Manual).

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

Time is Money Join Law Insider Premium to draft better contracts faster.