Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.

Appears in 15 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

AutoNDA by SimpleDocs

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2250.

Appears in 7 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6750.

Appears in 6 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6750.

Appears in 6 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2900.

Appears in 6 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2800.

Appears in 5 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4000.

Appears in 4 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2250.

Appears in 4 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1749.

Appears in 4 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0525.

Appears in 4 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1202

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1055

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1055

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2873.

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1749.

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2125.

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0800.

Appears in 3 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6216.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2385.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2838.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5475.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6000.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2800.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4327.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3225.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2838.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2865.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3802.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1446.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5260.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4865.

Appears in 2 contracts

Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9100.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1256.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4703.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5858.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3210.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2200.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6390.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2541.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5547.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5000.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0805.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3591.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1605.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5549.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2700.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5299.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3777.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5600.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3400.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4885.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2355.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3501.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6125.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1505.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0480.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3405.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4510.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2700.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6500.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

AutoNDA by SimpleDocs

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3159.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1400.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4372.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4357.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1600.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9012.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5450.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4659.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.9895.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2300.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4100.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0576.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3656.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4450.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.8901.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5657.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5586.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9811.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5000.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3435.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2158.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2823.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3400.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4066.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.9000.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4703.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4162.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4750.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0140.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.8528.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3750.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5549.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.2105

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1700.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4627.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1559.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 12.0000.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5430.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3700.

Appears in 1 contract

Samples: Indefinite Delivery Indefinite Quantity Construction Contract

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!