Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.
Appears in 15 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2250.
Appears in 7 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6750.
Appears in 6 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6750.
Appears in 6 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2900.
Appears in 6 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2800.
Appears in 5 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4000.
Appears in 4 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2250.
Appears in 4 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1749.
Appears in 4 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0525.
Appears in 4 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1202
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1055
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.1055
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2873.
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1749.
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2125.
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0800.
Appears in 3 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6216.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2385.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2838.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5475.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6000.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2800.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4327.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3225.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2838.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2865.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3802.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1446.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5260.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4865.
Appears in 2 contracts
Samples: Indefinite Delivery Indefinite Quantity Construction Contract, Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9100.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1256.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4703.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5858.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3210.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2200.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6390.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2541.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5547.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5000.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0805.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3591.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1605.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5549.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2700.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate ProjectsRate: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5299.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3777.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5600.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3400.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4885.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2355.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3501.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6125.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1505.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0480.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3405.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4510.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2700.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.6500.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3159.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1400.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4372.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4357.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1600.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9012.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5450.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4659.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.9895.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2300.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4100.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0576.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3656.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4450.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.8901.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5657.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5586.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 10.9811.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5000.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3435.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2158.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.2823.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3400.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4066.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.9000.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4703.
Appears in 1 contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4162.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4750.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.0140.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.8528.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3750.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5549.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.1.2105
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1700.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.4627.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.1559.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 12.0000.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.5430.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract
Other Than Normal Working Hours. Non-prevailing Prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, Sunday and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 11.3700.
Appears in 1 contract
Samples: Indefinite Delivery Indefinite Quantity Construction Contract